WELL · 42-183-30424 · DISTRICT 6
J.A. McLendon Estate Unit No. 1 #1
Gregg County · Vertical
J.A. Mclendon Estate Unit NO. 1 #1 (API 42-183-30424) is a permitted well in Gregg County filed by Delaware Nelson Petroleum CO.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1979 and 1980, permitted to 8,150 ft.
Its 2 leases have reported 885 barrels of oil and 208K mcf of gas since January 1993, last reporting in April 2019. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Tulsa, OK · P-5 Y, filed Jan 14, 1983 · 9 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Chinn Exploration Companythrough Feb 2015 |
| Latest permit | Delaware Nelson Petroleum Co.Sep 2, 1980 |
- 8,150
- total depth, ft
- 2
- permits on file
- Sep 2, 1980
- last permit issued
- —
- completed
- 885
- cumulative oil, bbl
- 208K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McLendon, J.A. G-6-173670 | Willow Springs-Mackey (Tr. Pk.) | Trivium Operating, LLC | 1 | 0 | 172K | Jun 1999 – Apr 2019 |
| McLendon, J.A. Estate Unit O-6-10272 | Willow Springs-Mackey (Tr. Pk.) | Agate Petroleum, Inc. | 1 | 885 | 35.9K | Jan 1993 – Oct 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Agate Petroleum, Inc.Jan 1993 → Aug 1999
- 2Carter ResourcesSep 1999 → Apr 2003
- 3Griffith ResourcesMay 2003 → Dec 2007
- 4Carter-Griffith Resources LLCJan 2004 → Feb 2004
- 5Now Development Co., Inc.Mar 2004 → Apr 2007
- 6West Mountain Operating Co, Inc.Jan 2008 → Aug 2008
- 7Chinn Exploration CompanySep 2008 → Feb 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 91270-99 | Recompletion | Delaware Nelson Petroleum Co. | Sep 2, 1980 | Sep 2, 1980 | — | 8,150 |
| 62307-99 | Drill | Delaware Nelson Petroleum Co. | Oct 30, 1979 | Oct 30, 1979 | Nov 16, 1979 | 8,150 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-173670 | — | — | — | — |
| — | — O-6-10272 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,900 | 6,912 | Perforated |
| 7,627 | 7,737 | Perforated |
| 7,627 | 7,950 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,072 | 12.25 | 575 S |
| 2.375 | 7,631 | — | — |
| 4.5 | 8,150 | 7.875 | 775 S |
| 4.5 | 8,150 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 17, 1999 | Jul 1, 1999 | — |
| 00 | Aug 5, 1999 | — | — |
| 00 | Jan 12, 1984 | Jun 17, 1980 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-183-30424 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-183-30424 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.