WELL · 42-183-30472 · DISTRICT 6

Barrett J. C. #4A

Plugged

Gregg County · East Texas field  · Vertical

Barrett J. C. #4A (API 42-183-30472) is a plugged well in Gregg County, plugged October 17, 1988, last operated by Sabine Pipe & Supply CO..

The RRC has issued one drilling permit, issued December 8, 1980, permitted to 3,700 ft.

Completion filings report one formation top, including Woodbine.

Operator of record

Sabine Pipe & Supply Co.

Kilgore, TX · P-5 Y, filed Jul 2, 2004 · 2 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSabine Pipe & Supply Co.
Production reportsnone
Latest permitSabine Pipe & Supply Co.Dec 8, 1980
3,700
total depth, ft
1
permits on file
Dec 8, 1980
last permit issued
May 2, 1981
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 2, 1981
Shut in
—
Plugged
Oct 17, 1988

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
101239-99DrillSabine Pipe & Supply Co.Oct 24, 1984Dec 8, 1980Mar 22, 19813,700

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Woodbine3,635

Perforations

Perforated and open-hole intervals.

FromToType
3,6403,647Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,00110.7575 S
4.53,6505.75125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 29, 1984May 24, 1984—
00Nov 21, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18330472, documented in the API reference.