WELL · 42-183-30560 · DISTRICT 6
Bryant, Scott #1
Gregg County · Vertical
Bryant, Scott #1 (API 42-183-30560) is a permitted well in Gregg County filed by Geo-Vest Of Texas, Inc.; no completion report is on file yet.
The RRC has issued 4 drilling permits between 1982 and 1988, permitted to 8,000 ft.
Completion filings report 4 formation tops, including Massive Anhydrite (marker), James Lime, Pettit, Travis Peak.
Operator of record
Kilgore, TX · P-5 Y, filed Jun 7, 2013 · 196 permits on file · (903) 720-6200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Geo-Vest of Texas, Inc.Dec 29, 1988 |
- 8,000
- total depth, ft
- 4
- permits on file
- Dec 29, 1988
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — O-6-12531 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 354398-99 | Recompletion | Geo-Vest of Texas, Inc. | Dec 27, 1988 | Dec 29, 1988 | — | 8,000 |
| 341605-99 | Recompletion | Geo-Vest of Texas, Inc. | Jan 19, 1988 | Jan 20, 1988 | — | 8,000 |
| 302390-99 | Recompletion | FMP Operating Company, Ltd PTN | May 19, 1986 | May 22, 1986 | — | 8,000 |
| 175276-99 | Drill | Excelsior Oil Corp. | Oct 25, 1982 | Oct 25, 1982 | — | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-12531 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 362 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Massive Anhydrite (marker)BASE;MASSIVE ANHYDRITE | 6,573 | -6,211 |
| James LimeJAMES | 7,041 | -6,679 |
| Pettit | 7,258 | -6,896 |
| Travis Peak | 7,495 | -7,133 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,882 | 6,910 | Perforated |
| 6,882 | 7,840 | Perforated |
| 7,392 | 7,456 | Perforated |
| 7,805 | 7,840 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,117 | 12.25 | 425 S |
| 2.375 | 7,327 | — | — |
| 5.5 | 8,000 | 8.75 | 35 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 14, 1989 | May 4, 1989 | — |
| 00 | May 24, 1989 | — | — |
| 00 | Jan 18, 1989 | Dec 21, 1988 | — |
| 00 | Nov 8, 1988 | Sep 6, 1988 | — |
| 00 | Oct 15, 1988 | — | — |
| 00 | Aug 10, 1988 | Jul 8, 1988 | — |
| 00 | Aug 2, 1988 | May 19, 1986 | — |
| 00 | Jul 8, 1988 | Mar 15, 1988 | Yes |
| 00 | Jul 5, 1988 | — | — |
| 00 | Aug 14, 1986 | May 19, 1986 | — |
| 00 | Aug 7, 1986 | — | — |
| 00 | Jan 12, 1984 | Mar 4, 1983 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-183-30560 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-183-30560 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18330560, documented in the API reference.