WELL · 42-183-30773 · DISTRICT 6
Hayes Unit #4
Gregg County · Vertical
Hayes Unit #4 (API 42-183-30773) is a permitted well in Gregg County filed by Hunt Petroleum Corporation; no completion report is on file yet.
The RRC has issued 3 drilling permits between 1989 and 2005, permitted to 10,716 ft.
Completion filings report 6 formation tops, including Paluxy, Glen Rose, BMA, Pettit.
Operator of record
Dallas, TX · P-5 Y, filed Mar 6, 2009 · 252 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | XTO Energy Inc.through Dec 2019 |
| Latest permit | Hunt Petroleum CorporationNov 30, 2005 |
- 10,716
- total depth, ft
- 3
- permits on file
- Nov 30, 2005
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.31M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hayes Unit G-6-133080 | Willow Springs (Cotton Valley) | Faulconer Energy, LLC | 1 | 0 | 1.31M | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pennzoil Exploration & Prod. Co.Jan 1993 → Dec 1994
- 2Sonat Exploration Company -TylerJan 1995 → Dec 1999
- 3EL Paso Production CompanyJan 2000 → Mar 2002
- 4Hunt Petroleum CorporationApr 2002 → Nov 2008
- 5XTO Energy Inc.Dec 2008 → Dec 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 609965-99 | Recompletion | Hunt Petroleum Corporation | Nov 22, 2005 | Nov 30, 2005 | — | 10,716 |
| 360013-99 | Drill | Pennzoil Exploration & Prod. Co. | May 8, 1989 | Jun 26, 1989 | — | 10,700 |
| 359034-99 | Drill | Pennzoil Exploration & Prod. Co. | May 8, 1989 | Jun 2, 1989 | — | 10,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-133080 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 363 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Paluxy | 4,605 | -4,242 |
| Glen Rose | 5,067 | -4,704 |
| BMA | 6,520 | -6,157 |
| Pettit | 7,196 | -6,833 |
| Travis Peak | 7,395 | -7,032 |
| Cotton Valley | 9,528 | -9,165 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,364 | 10,525 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,100 | 12.5 | 435 S |
| 4.5 | 10,716 | 7.875 | 1,800 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 7, 1990 | Jan 10, 1990 | Yes |
| 00 | Feb 1, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-183-30773 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-183-30773 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18330773, documented in the API reference.