WELL · 42-183-30891 · DISTRICT 6

Fisher-Duncan GU #2

Y

Gregg County · Willow Springs (Cotton Valley) field · Temp Abandoned  · Vertical

Fisher-Duncan GU #2 (API 42-183-30891) is a well in Gregg County operated by Craton Operating LLC, completed December 14, 1991 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued August 16, 1991, permitted to 11,500 ft.

It was permitted by Global Natural Resources Corp. and has since transferred to Craton Operating LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Massive Anhydrite (marker), Rodessa, James Lime, Pettit.

No lease production has been reported under this well’s leases.

Operator of record

Craton Operating LLC

Permitted by Global Natural Resources Corp.; the EWA schedule now lists a different operator.

Bellaire, TX · P-5 Y, filed Mar 4, 2026 · 14 permits on file · (713) 900-3456

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCraton Operating LLC
Production reportsCraton Operating LLCthrough Apr 2026
Latest permitGlobal Natural Resources Corp.Aug 16, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
1
permits on file
Aug 16, 1991
last permit issued
Dec 14, 1991
completed
0
cumulative oil, bbl
920K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 14, 1991
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fisher-Duncan GU G-6-140509Willow Springs (Cotton Valley,w)Craton Operating LLC10920KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 86 · prior 12 1,405(-94%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Global Natural Resources Corp.Jan 1993 → Oct 1993
  2. 2Dallas Production, Inc.Nov 1993 → Sep 1996
  3. 3Universal Resources Corp.Oct 1996 → Mar 1999
  4. 4Questar Expl. and Prod. Co.Apr 1999 → Dec 2006
  5. 5Houston Exploration Company, TheJan 2007 → Jun 2007
  6. 6Forest Oil CorporationJul 2007 → Mar 2015
  7. 7Sabine Oil & Gas CorporationApr 2015 → Dec 2022
  8. 8Craton Operating LLCJan 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
390980-99DrillGlobal Natural Resources Corp.Aug 16, 1991Aug 16, 1991Aug 26, 199111,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-140509————

Formation tops

As filed on W-2/G-1. Subsea from 356 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)MASSIVE ANHYDRITE6,335-5,979
Rodessa6,580-6,224
James LimeJAMES7,050-6,694
Pettit7,280-6,924
Travis Peak7,470-7,114
LWR Cotton Valley10,200-9,844

Perforations

Perforated and open-hole intervals.

FromToType
10,50210,623Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,12311320 S
5.510,7007.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 18, 1992Jan 14, 1992Yes
00Feb 11, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18330891, documented in the API reference.