WELL · 42-183-30908 · DISTRICT 6

Kelly G.A. #4

Y

Gregg County · Willow Springs (Travis Peak) field · Producing  · Vertical

Kelly G.A. #4 (API 42-183-30908) is a well in Gregg County operated by Faulconer Energy LLC, completed December 19, 1992 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued December 20, 1991, permitted to 9,200 ft.

It was permitted by Machin, Art & Associates, Inc. and has since transferred to Faulconer Energy LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Austin Chalk, T.A.C., Glen Rose, T. Glen Rose.

No lease production has been reported under this well’s leases.

Operator of record

Faulconer Energy LLC

Permitted by Machin, Art & Associates, Inc.; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Sep 4, 2025 · 46 permits on file · (337) 332-1726

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFaulconer Energy LLC
Production reportsFaulconer Energy, LLCthrough Mar 2026
Latest permitMachin, Art & Associates, Inc.Dec 20, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,200
total depth, ft
1
permits on file
Dec 20, 1991
last permit issued
Dec 19, 1992
completed
0
cumulative oil, bbl
2.13M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 19, 1992
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kelly, G.A. G-6-142589Willow Springs (Travis Peak)Faulconer Energy, LLC102.13MJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 165 · prior 12 1,178(-86%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Machin & Associates, Inc.Jan 1993 → May 1994
  2. 2Sonat Exploration Company -TylerJun 1994 → Dec 1999
  3. 3EL Paso Production CompanyJan 2000 → Mar 2002
  4. 4Hunt Petroleum CorporationApr 2002 → Aug 2008
  5. 5XTO Energy Inc.Jul 2010 → Mar 2023
  6. 6Faulconer Energy, LLCApr 2023 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
395335-99DrillMachin, Art & Associates, Inc.Dec 20, 1991Dec 20, 1991Apr 16, 19929,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-142589————

Formation tops

As filed on W-2/G-1. Subsea from 285 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk3,330-3,045
T.A.C.3,330-3,045
Glen Rose4,868-4,583
T. Glen Rose4,868-4,583
Tma6,220-5,935
BMA6,463-6,178
Pettit7,157-6,872
T. Pettit7,157-6,872
Travis Peak7,360-7,075
T. Travis Peak7,360-7,075

Perforations

Perforated and open-hole intervals.

FromToType
7,9738,454Perforated
8,3378,998Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,02911275 S
4.59,1507.875972 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 26, 1993Dec 23, 1992—
00Nov 4, 1992Sep 29, 1992Yes
00Oct 27, 1992——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.