WELL · 42-183-31026 · DISTRICT 6

Castleberry J.J. Estate A #4

N

Gregg County · Willow Springs (T.peak Trans.) field  · Vertical

Castleberry J.J. Estate A #4 (API 42-183-31026) is a well in Gregg County operated by Dallas Production Inc., completed March 15, 2014.

The RRC has issued 3 drilling permits between 1993 and 2017, permitted to 11,000 ft.

Completion filings report 11 formation tops, including Base Mass. Anhy, Rodessa, Pettit, Travis Peak.

Its 3 leases have reported 20.4K barrels of oil and 1.42M mcf of gas since September 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Dallas Production Inc.

Dallas, TX · P-5 Y, filed Dec 4, 2020 · 823 permits on file · (214) 265-4319

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDallas Production Inc.
Production reportsDallas Production Company LLCthrough Apr 2026
Latest permitDallas Production, Inc.Feb 27, 2017

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
3
permits on file
Feb 27, 2017
last permit issued
Mar 15, 2014
completed
20.4K
cumulative oil, bbl
1.42M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 15, 2014
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Castleberry, J. J. Estate A O-6-15545Willow Springs (Pettit)Dallas Production Company LLC118.1K78.5KMay 2017 – Jul 2026
Castleberry, J.J. Estate 'A' O-6-15293Willow Springs (T.peak Trans.)Dallas Production, Inc.12.36K20.3KMar 2014 – Jan 2018
Castleberry, J.J. Estate G-6-146723Willow Springs (Cotton Valley,w)Dallas Production, Inc.101.33MSep 1993 – Mar 2014

Oil, barrels lease total

Last 12 months 1,096 · prior 12 1,134(-3%)

050100150202420252026

Gas, mcf lease total

Last 12 months 4,215 · prior 12 5,116(-18%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Roach, R. Byron TrusteeSep 1993 → Jun 1998
  2. 2Dallas Production, Inc.Jul 1998 → Feb 2021
  3. 3Dallas Production Company LLCMar 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
820454-99RecompletionDallas Production, Inc.Nov 16, 2016Feb 27, 2017—7,620
765500-99RecompletionDallas Production, Inc.Jun 26, 2013Oct 14, 2013Feb 17, 201410,600
411891-99DrillRoach, R. Byron TrusteeMay 18, 1993Jul 7, 1993Jul 19, 199311,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-146723————
—— O-6-15293————
—— O-6-15545————

Formation tops

As filed on W-2/G-1. Subsea from 385 ft elevation.Download CSV →

FormationMD ftSubsea
Base Mass. Anhy6,758-6,373
Rodessa6,942-6,557
PettitPETTET7,454-7,069
Pettit7,454-7,069
Travis Peak7,690-7,305
Cotton Valley10,609-10,224
TaylorTAYLOR COTTON VALLEY10,609-10,224
BlossomBLOSSOM - LANSING, N. FIELD ONLY——
Glen RoseGLEN ROSE - CHARGED ZONE——
GoodlandGOODLAND - CHARGED ZONE——
Pecan Gap——
RodessaRODESSA-YOUNG - LANSING, NORTH S——
WoodbineWOODBINE - EAST TEXAS FIELD (DIS——

Perforations

Perforated and open-hole intervals.

FromToType
7,5397,545Perforated
7,6927,770Perforated
10,62410,696Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,733111,157 S
4.510,8107.8751,075 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 14, 2017Jun 15, 2017—
00Jul 25, 2014May 5, 2014—
00Nov 15, 1993Sep 21, 1993Yes
00Oct 7, 1993——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18331026, documented in the API reference.