WELL · 42-183-31271 · DISTRICT 6
Flewellen Gas Unit #6
Gregg County · Willow Springs (Travis Peak) field · Vertical
Flewellen Gas Unit #6 (API 42-183-31271) is a plugged well in Gregg County, plugged March 6, 2015, last operated by Cook Exploration CO..
The RRC has issued 2 drilling permits between 1996 and 1999, permitted to 11,000 ft.
Completion filings report 3 formation tops, including James Lime, Pine Island, Travis Peak.
Operator of record
Longview, TX · P-5 Y, filed Dec 4, 2025 · 56 permits on file · (903) 237-8876
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cook Exploration Co. |
| Production reports | Cook Exploration Co.through Mar 2009 |
| Latest permit | Cook Exploration Co.Dec 15, 1999 |
- 11,000
- total depth, ft
- 2
- permits on file
- Dec 15, 1999
- last permit issued
- Feb 9, 2000
- completed
- 0
- cumulative oil, bbl
- 381K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1997 THROUGH Mar 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 9, 2000
- Shut in
- —
- Plugged
- Mar 6, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flewellen G-6-164586 | Willow Springs (Cotton Valley,w) | Cook Exploration Co. | 1 | 0 | 80.1K | Jun 1997 – Mar 2015 |
| Flewellen Gas Unit G-6-176975 | Willow Springs (Travis Peak) | Cook Exploration Co. | 1 | 0 | 301K | Feb 2000 – Mar 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cook Exploration Co.Jun 1997 → Mar 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 490396-99 | Recompletion | Cook Exploration Co. | Dec 15, 1999 | Dec 15, 1999 | Feb 3, 2000 | 10,792 |
| 456360-99 | Drill | Cook Exploration Co. | Dec 16, 1996 | Dec 16, 1996 | Mar 28, 1997 | 11,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-164586 | — | — | — | — |
| — | — G-6-176975 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 323 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| James LimeJAMES | 6,986 | -6,663 |
| Pine Island | 7,136 | -6,813 |
| Travis Peak | 7,411 | -7,088 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,587 | 7,595 | Perforated |
| 10,539 | 10,609 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,566 | 11 | 395 S |
| 4.5 | 10,781 | 7.875 | 1,625 S |
| 4.5 | — | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 23, 2000 | Mar 27, 2000 | — |
| 00 | Jun 1, 2000 | — | — |
| 00 | Oct 10, 1997 | Aug 13, 1997 | Yes |
| 00 | Oct 6, 1997 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-183-31271 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-183-31271 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18331271, documented in the API reference.