WELL · 42-183-31362 · DISTRICT 6
Horton Toby Gas Unit No. 1 #7
Gregg County · Danville (TP-CV Cons.) field · Vertical
Horton Toby Gas Unit NO. 1 #7 (API 42-183-31362) is a plugged well in Gregg County, plugged August 20, 2019, last operated by Titan Rock E&P LLC.
The RRC has issued one drilling permit, issued April 27, 1999, permitted to 9,000 ft.
It was permitted by Geo-Vest Of Texas, Inc. and has since transferred to Titan Rock E&P LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Base Of Massive Anhy, James Lime, Pettit.
Operator of record
Permitted by Geo-Vest of Texas, Inc.; the EWA schedule now lists a different operator.
Kilgore, TX · P-5 Y, filed Feb 2, 2024 · 1 permits on file · (214) 577-2076
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Titan Rock E&P LLC |
| Production reports | Burlington Resources O & G Co LPthrough Dec 2007 |
| Latest permit | Geo-Vest of Texas, Inc.Apr 27, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Apr 27, 1999
- last permit issued
- Jul 14, 1999
- completed
- 0
- cumulative oil, bbl
- 856K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1999 THROUGH Aug 2019
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 14, 1999
- Shut in
- —
- Plugged
- Aug 20, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Horton, Toby Gas Unit No. 1 G-6-173826 | Danville (Travis Peak Cons.) | Titan Rock E&P, LLC | 1 | 0 | 856K | Jul 1999 – Aug 2019 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Geo-Vest of Texas, Inc.Jul 1999 → Aug 2005
- 2Burlington Resources O & G Co LPSep 2005 → Dec 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 484099-99 | Drill | Geo-Vest of Texas, Inc. | Apr 26, 1999 | Apr 27, 1999 | Jun 3, 1999 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-173826 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 385 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base of Massive Anhy | 6,566 | -6,181 |
| James LimeBASE OF JAMES LIME | 7,143 | -6,758 |
| PettitTOP OF PETTIT | 7,247 | -6,862 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,283 | 7,757 | Perforated |
| 7,757 | 7,464 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,022 | 11 | 211 S |
| 5.5 | 7,800 | 7.875 | 830 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 26, 1999 | Jul 28, 1999 | — |
| 00 | Aug 24, 1999 | Jul 15, 1999 | Yes |
| 00 | Aug 13, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-183-31362 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-183-31362 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18331362, documented in the API reference.