WELL · 42-183-31691 · DISTRICT 6
Cameron #1
Gregg County · Wildcat field · Vertical
Cameron #1 (API 42-183-31691) is a plugged well in Gregg County, plugged May 18, 2007, last operated by Maximus Operating Ltd..
The RRC has issued one drilling permit, issued June 29, 2004, permitted to 9,000 ft.
It was permitted by Key Production Company, Inc. and has since transferred to Maximus Operating Ltd. on the wellbore schedule.
Completion filings report 5 formation tops, including Austin Chalk, Woodbine, Massive Anhydrite (marker), Rodessa.
Its lease has reported 75 barrels of oil since October 2004, last reporting in June 2007.
Operator of record
Permitted by Key Production Company, Inc.; the EWA schedule now lists a different operator.
Kilgore, TX · P-5 Y, filed Aug 4, 2025 · 107 permits on file · (903) 753-0941
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Maximus Operating Ltd. |
| Production reports | Key Production Company, Inc.through Nov 2004 |
| Latest permit | Key Production Company, Inc.Jun 29, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Jun 29, 2004
- last permit issued
- Jul 29, 2004
- completed
- 75
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2004 THROUGH Jun 2007
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 29, 2004
- Shut in
- —
- Plugged
- May 18, 2007
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cameron O-6-14342 | Wildcat | Maximus Operating, Ltd. | 1 | 75 | 0 | Oct 2004 – Jun 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Key Production Company, Inc.Nov 2004 → Nov 2004
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 547586-99 | Drill | Key Production Company, Inc. | Jun 29, 2004 | Jun 29, 2004 | Jul 8, 2004 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-14342 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 476 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 3,670 | -3,194 |
| Woodbine | 3,882 | -3,406 |
| Massive Anhydrite (marker)MASSIVE ANHYDRITE | 7,122 | -6,646 |
| Rodessa | 7,333 | -6,857 |
| Pettit | 7,985 | -7,509 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,533 | 7,540 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,400 | 11 | 393 S |
| 5.5 | 8,258 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 9, 2004 | Aug 20, 2004 | Yes |
| 00 | Oct 12, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-183-31691 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-183-31691 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18331691, documented in the API reference.