WELL · 42-183-32014 · DISTRICT 6

Griffin Ranch G.U. 5 #3

Y

Gregg County · Danville (TP-CV Cons.) field · Temp Abandoned  · Vertical

Griffin Ranch G.U. 5 #3 (API 42-183-32014) is a well in Gregg County operated by Sydri Operating LLC, completed May 30, 2008 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued February 5, 2008, permitted to 8,000 ft.

It was permitted by Exco Operating Company, LP and has since transferred to Sydri Operating LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Massive Anhydrite (marker), B/ Massive, Rodessa, James Lime.

No lease production has been reported under this well’s leases.

Operator of record

Sydri Operating LLC

Permitted by Exco Operating Company, LP; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Dec 4, 2025 · 46 permits on file · (972) 754-8626

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSydri Operating LLC
Production reportsTitan Rock E&P, LLCthrough Oct 2022
Latest permitGeo-Vest of Texas, Inc.Feb 5, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
2
permits on file
Feb 5, 2008
last permit issued
May 30, 2008
completed
0
cumulative oil, bbl
205K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 30, 2008
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Griffin Ranch G.U. 5 G-6-244129Danville (TP-CV Cons.)Sydri Operating, LLC10205KMay 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exco Operating Company, LPJun 2008 → Jan 2013
  2. 2Exco/Hgi JV Assets, LLCFeb 2013 → Jul 2013
  3. 3Indigo Resources LLCFeb 2016 → Jul 2018
  4. 4Titan Rock E&P, LLCAug 2018 → Oct 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
653984-98DrillExco Operating Company, LPOct 14, 2008Feb 5, 2008Apr 27, 20088,000
653984-99DrillGeo-Vest of Texas, Inc.Jan 25, 2008Feb 5, 2008Apr 27, 20088,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-244129————

Formation tops

As filed on W-2/G-1. Subsea from 291 ft elevation.Download CSV →

FormationMD ftSubsea
Massive Anhydrite (marker)BASE OF MASSIVE ANHYDRITE6,481-6,190
B/ Massive6,481-6,190
Rodessa6,532-6,241
RodessaTOP OF RODESSA6,532-6,241
James LimeJAMES LM6,846-6,555
James LimeTOP OF JAMES LIME6,846-6,555
Travis Peak7,377-7,086

Perforations

Perforated and open-hole intervals.

FromToType
7,4607,898Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,08211390 S
5.58,1247.8751,350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 9, 2011Oct 19, 2010—
00Apr 20, 2009Aug 6, 2008Yes
00Jan 23, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18332014, documented in the API reference.