WELL · 42-185-30471 · DISTRICT 3

Que Pasa B 2ST #2H

Y

Grimes County · Giddings (Austin Chalk Gas) field · Producing  · Horizontal · Sidetrack

Que Pasa B 2st #2H (API 42-185-30471) is a horizontal well in Grimes County operated by Southwest Resources Inc., completed March 26, 1996 and listed as producing on the RRC schedule.

The RRC has issued 3 drilling permits between 1994 and 1996, permitted to 15,500 ft.

It was permitted by Torch Operating Company and has since transferred to Southwest Resources Inc. on the wellbore schedule.

Completion filings report one formation top, including Austin Chalk.

No lease production has been reported under this well’s leases.

Operator of record

Southwest Resources Inc.

Permitted by Torch Operating Company; the EWA schedule now lists a different operator.

Brenham, TX · P-5 Y, filed Mar 4, 2026 · 3 permits on file · (979) 203-6530

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSouthwest Resources Inc.
Production reportsSouthwest Resources, Inc.through May 2023
Latest permitTorch Operating CompanyJan 4, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,500
total depth, ft
3
permits on file
Jan 4, 1996
last permit issued
Mar 26, 1996
completed
0
cumulative oil, bbl
11.5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 26, 1996
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Que Pasa "B" 2ST G-3-153774Giddings (Austin Chalk, Gas)One World Operating, LLC1011.5MDec 1994 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Torch Operating CompanyMay 1995 → Apr 1997
  2. 2Nuevo Energy CompanyMay 1997 → Jun 2002
  3. 3Hilcorp Energy CompanyJul 2002 → May 2021
  4. 4Chalker Energy Management,llcFeb 2004 → Mar 2006
  5. 5Forest Oil CorporationApr 2006 → Dec 2012
  6. 6Southwest Resources, Inc.Jun 2021 → May 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
443432-99Recompletion · sidetrackTorch Operating CompanyJan 4, 1996Jan 4, 1996Jan 22, 199615,500
435055-99Recompletion · sidetrackTorch Operating CompanyApr 20, 1995Apr 20, 1995Apr 20, 199515,500
428760-99DrillTorch Operating CompanyOct 3, 1994Oct 3, 1994Oct 13, 199414,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-153774————

Formation tops

As filed on W-2/G-1. Subsea from 195 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk12,590-12,395

Perforations

Perforated and open-hole intervals.

FromToType
12,60013,060Open hole
12,60013,640Open hole
12,60013,678Open hole
12,60015,200Open hole
12,60016,431Open hole
12,66012,970Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1645——
10.753,24414.751,475 S
7.62512,6009.875595 S
7.62512,6609.875595 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 1, 1996Apr 26, 1996Yes
00Sep 26, 1995Jun 15, 1995Yes
00May 9, 1995Feb 21, 1995Yes
00May 3, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18530471, documented in the API reference.