WELL · 42-185-30904 · DISTRICT 3
Nevill AC #1
Grimes County · Horizontal
Nevill AC #1 (API 42-185-30904) is a permitted horizontal well in Grimes County filed by Cml Exploration, LLC; no completion report is on file yet.
The RRC has issued one drilling permit, issued September 15, 2026, permitted to 8,950 ft.
Operator of record
Austin, TX · P-5 Y, filed Jul 4, 2026 · 514 permits on file · (800) 460-6313
SOURCE · LATEST PERMIT (NO EWA RECORD)
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | CML Exploration, LLCSep 15, 2026 |
- 8,950
- total depth, ft
- 1
- permits on file
- Sep 15, 2026
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Surface location
30.813535, -96.130174
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Grimes County.
Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 918607-99 | Drill | CML Exploration, LLC | Sep 11, 2026 | Sep 15, 2026 | — | 8,950 |
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well has no tops filed, so it cannot anchor a section; its neighbours can.
Knotts Unit42-185-30641
3.7 KM · Patterson Petroleum LP · Section with this well →
| Wilcox | 1,890 | -1,592 |
| Austin Chalk | 8,314 | -8,016 |
| Austin Chalk | 8,365 | -8,067 |
| Buda | 9,430 | -9,132 |
| Buda | 9,480 | -9,182 |
| Georgetown | 9,510 | -9,212 |
| Del Rio | 9,545 | -9,247 |
| Georgetown | 9,553 | -9,255 |
13 TOPS · FIRST 8
Holth42-185-30515
4.0 KM · Pride Energy Company · Section with this well →
| Austin Chalk | 8,565 | -8,223 |
| Sub-Clarksville | 8,920 | -8,578 |
| Woodbine | 8,965 | -8,623 |
| Buda | 9,796 | -9,454 |
County Line42-313-31126
4.3 KM · Woodbine Acquisition LLC · Section with this well →
| Austin Chalk | 8,015 | -7,991 |
| Austin Chalk | 8,370 | -8,346 |
| Woodbine | 8,463 | -8,439 |
| Top Window | 8,476 | -8,452 |
| Red MKR | 8,487 | -8,463 |
| Base Window | 8,498 | -8,474 |
| Sub-Clarksville | — | |
| Buda | — |
14 TOPS · FIRST 8
Rainier (Allocation)42-313-31352
4.6 KM · MD America Energy, LLC · Section with this well →
| Sub-Clarksville | 8,361 | -8,128 |
| Woodbine | 8,463 | -8,230 |
| Eagle Ford | 8,957 | -8,724 |
| Wilcox | — | |
| Buda | — | |
| Dex-Buda | — | |
| Frio | — | |
| Georgetown | — |
10 TOPS · FIRST 8
Carolina42-313-31254
5.9 KM · MD America Energy, LLC · Section with this well →
| Sub-Clarksville | 8,469 | -8,444 |
| Woodbine | 8,559 | -8,534 |
| Eagle Ford | 9,063 | -9,038 |
| Lewisville - Disposal | — | |
| Rodessa | — | |
| Wilcox | — | |
| Dex-Buda | — | |
| Frio | — |
10 TOPS · FIRST 8
Odom, Henry K. #142-041-30379
5.9 KM · Etx Energy, LLC · Section with this well →
| Midway | 4,700 | -4,466 |
| Pecan Gap | 7,000 | -6,766 |
| Austin Chalk | 7,750 | -7,516 |
| Eagle Ford | 8,300 | -8,066 |
| Buda | 9,000 | -8,766 |
Deborah Camp (Allocation)42-313-31361
6.0 KM · MD America Energy, LLC · Section with this well →
| Sub-Clarksville | 8,478 | -8,179 |
| Woodbine | 8,569 | -8,270 |
| Eagle Ford | 9,127 | -8,828 |
| Lewisville - Disposal | — | |
| Wilcox | — | |
| Buda | — | |
| Dex-Buda | — | |
| Frio | — |
10 TOPS · FIRST 8
Camp42-313-30874
6.0 KM · Pmo · Section with this well →
| Austin Chalk | 8,129 | -7,830 |
| Ash Marker | 8,437 | -8,138 |
| Sub-Clarksville | 8,490 | -8,191 |
| Woodbine | 8,561 | -8,262 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/18530904, documented in the API reference.