WELL · 42-187-30976 · DISTRICT 1

Premier/Haecker #6

N

Guadalupe County · LA Vernia field  · Vertical

Premier/Haecker #6 (API 42-187-30976) is a well in Guadalupe County operated by Source Petroleum Inc., completed June 1, 1981.

The RRC has issued one drilling permit, issued September 17, 1979, permitted to 1,000 ft.

It was permitted by Texpro, Inc. and has since transferred to Source Petroleum Inc. on the wellbore schedule.

Its lease has reported 9.68K barrels of oil and 82 mcf of gas since January 1993, last reporting in July 2026. The lease carries 12 wells, so these are lease totals, not this well alone.

Operator of record

Source Petroleum Inc.

Permitted by Texpro, Inc.; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Apr 4, 2026 · 35 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSource Petroleum Inc.
Production reportsTanglehead Operating, LLCthrough Aug 2022
Latest permitTexpro, Inc.Sep 17, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,000
total depth, ft
1
permits on file
Sep 17, 1979
last permit issued
Jun 1, 1981
completed
9.68K
cumulative oil, bbl
82
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 1, 1981
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Haecker, Jack O-1-9369LA VerniaTanglehead Operating, LLC129.68K82Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Source Petroleum Inc.Jan 1993 → Jul 1994
  2. 2Haecker, JackJun 1995 → May 2011
  3. 3Haecker, JosephSep 2012 → Feb 2016
  4. 4G6 EnterprisesMar 2016 → Oct 2020
  5. 5J.A.G. Oil & GasNov 2020 → Jul 2021
  6. 6Tanglehead Operating, LLCAug 2021 → Aug 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
58052-99DrillTexpro, Inc.Sep 17, 1979Sep 17, 1979Sep 4, 19801,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-9369————

Perforations

Perforated and open-hole intervals.

FromToType
765776Perforated
—776Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.375770——
4.58226.7596 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 31, 1989——
00Aug 26, 1989——
00Jan 12, 1984Nov 12, 1980—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18730976, documented in the API reference.