WELL · 42-187-32121 · DISTRICT 1

Smith Leroy #2

Plugged

Guadalupe County · LA Vernia (Austin Chalk Crevice) field  · Vertical

Smith Leroy #2 (API 42-187-32121) is a plugged well in Guadalupe County, plugged July 28, 2006, last operated by Midstates Corporation.

The RRC has issued 2 drilling permits between 1982 and 1984, permitted to 2,310 ft.

It was permitted by T.O.P.S., Inc. and has since transferred to Midstates Corporation on the wellbore schedule.

Completion filings report 2 formation tops, including Navarro, Austin Chalk.

Its lease has reported 339 barrels of oil and 17 mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Midstates Corporation

Permitted by T.O.P.S., Inc.; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Jan 5, 2026 · 13 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMidstates Corporation
Production reportsMidstates Corporationthrough Jul 1998
Latest permitT.O.P.S., Inc.Dec 31, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,310
total depth, ft
2
permits on file
Dec 31, 1984
last permit issued
Mar 1, 1985
completed
339
cumulative oil, bbl
17
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 1, 1985
Shut in
—
Plugged
Jul 28, 2006

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Smith, Leroy O-1-10254LA Vernia (Austin Chalk Crevice)Midstates Corporation133917Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1T.O.P.S.Jan 1993 → Feb 1993
  2. 2Outline Oil Corp.Mar 1993 → Apr 1993
  3. 3Midstates CorporationMay 1993 → Jul 1998

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
262861-99RecompletionT.O.P.S., Inc.Dec 27, 1984Dec 31, 1984—2,310
160604-99DrillT.O.P.S., Inc.May 12, 1982May 12, 1982—1,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-10254————

Formation tops

As filed on W-2/G-1. Subsea from 542 ft elevation.Download CSV →

FormationMD ftSubsea
Navarro1,248-706
Austin Chalk2,336-1,794

Perforations

Perforated and open-hole intervals.

FromToType
1,2481,278Perforated
2,3102,354Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3751,216——
4.52,3106.75385 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 26, 1985Mar 11, 1985—
00Mar 23, 1985——
00Jan 12, 1984Jul 23, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18732121, documented in the API reference.