WELL · 42-187-32281 · DISTRICT 1

Lenz Adolph #XC1

N

Guadalupe County · LA Vernia (Austin Chalk) field  · Vertical

Lenz Adolph #XC1 (API 42-187-32281) is a well in Guadalupe County operated by Nova Energy Group Inc., completed November 5, 1982.

The RRC has issued 2 drilling permits between 1982 and 1983, permitted to 2,300 ft.

Completion filings report one formation top, including Navarro.

Its lease has reported 3.32K barrels of oil and 23 mcf of gas since January 1993, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

Nova Energy Group Inc.

Houston, TX · P-5 Y, filed Jun 15, 1989 · 124 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNova Energy Group Inc.
Production reportsThree J Energy, Inc.through Mar 2025
Latest permitNova Energy Group, Inc.Aug 17, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,300
total depth, ft
2
permits on file
Aug 17, 1983
last permit issued
Nov 5, 1982
completed
3.32K
cumulative oil, bbl
23
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 5, 1982
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lenz, Adolph -X- O-1-8429LA VerniaThree J Energy, Inc.63.32K23Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 22(-100%)

0123202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Two J EnergyJan 1993 → Feb 1997
  2. 2Maria Investments Inc.Mar 1997 → May 2003
  3. 3Three J Energy IncJun 2003 → Jun 2004
  4. 4New BeginningJul 2004 → Jun 2016
  5. 5Three J Energy, Inc.Jul 2016 → Mar 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
206092-99RecompletionNova Energy Group, Inc.Aug 9, 1983Aug 17, 1983Aug 17, 1983950
175408-99DrillSchoenfeld, Joachim H.P.Oct 26, 1982Oct 26, 1982—2,300

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-8429————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Navarro720

Perforations

Perforated and open-hole intervals.

FromToType
710810Perforated
1,8701,875Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.58006.75—
2.3751,850——
4.51,8706.75191 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 18, 1989Sep 7, 1989Yes
00Sep 16, 1989——
00Jan 12, 1984Dec 2, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18732281, documented in the API reference.