WELL · 42-187-33264 · DISTRICT 1

Howell Lease #1 #6

Plugged

Guadalupe County · LA Vernia (Austin Chalk) field  · Vertical

Howell Lease #1 #6 (API 42-187-33264) is a plugged well in Guadalupe County, plugged December 4, 2015, last operated by Howell Crane & Rigging Inc..

The RRC has issued one drilling permit, issued May 3, 1988, permitted to 2,400 ft.

It was permitted by Nova Energy Group, Inc. and has since transferred to Howell Crane & Rigging Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Green Sand, Taylor.

Its lease has reported 6.78K barrels of oil since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Howell Crane & Rigging Inc.

Permitted by Nova Energy Group, Inc.; the EWA schedule now lists a different operator.

San Antonio, TX · P-5 Y, filed Oct 4, 2025 · (210) 661-8285

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHowell Crane & Rigging Inc.
Production reportsHowell Crane & Rigging, Inc.through Feb 2026
Latest permitNova Energy Group, Inc.May 3, 1988

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,400
total depth, ft
1
permits on file
May 3, 1988
last permit issued
Mar 1, 1990
completed
6.78K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 1, 1990
Shut in
—
Plugged
Dec 4, 2015

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Howell Lease #1 O-1-6034LA Vernia (Austin Chalk)Howell Crane & Rigging, Inc.46.78K0Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 98 · prior 12 121(-19%)

01020202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1J.N.J. EnergyFeb 1997 → Feb 1997
  2. 2Howell Crane & Rigging, Inc.Mar 1997 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
345972-99DrillNova Energy Group, Inc.May 2, 1988May 3, 1988May 17, 19882,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-6034————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Green Sand1,262
TaylorTAYLOR MORAL1,912

Perforations

Perforated and open-hole intervals.

FromToType
2,3542,716Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
4.52,7166.75205 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 6, 1990Mar 29, 1990Yes
00Jul 3, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

1.7K
bbl, last 12 reported months
62K
bbl, all reported
Nov 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000071537W-14 DisposalPlugged Jan 11, 20162001002,640–2,650

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 1,695 · prior 12 3,410(-50%)

010020030020142015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/18733264, documented in the API reference.