WELL · 42-195-00246 · DISTRICT 10
Smith Joe #1
Hansford County · Hansford (Morrow Upper) field · Vertical
Smith Joe #1 (API 42-195-00246) is a well in Hansford County operated by Strat Land Exploration Company, completed March 29, 2012.
The RRC has issued one drilling permit, issued June 4, 2012, permitted to 7,600 ft.
Completion filings report 3 formation tops, including Douglas, Morrow, Mississippian.
Its 2 leases have reported 13.1K barrels of oil and 332K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Strat Land Exploration Company
Tulsa, OK · P-5 Y, filed Nov 4, 2022 · 607 permits on file · (806) 435-7292
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Strat Land Exploration Company |
| Production reports | Mewbourne Oil Companythrough Apr 2026 |
| Latest permit | Strat Land Exploration CompanyJun 4, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,600
- total depth, ft
- 1
- permits on file
- Jun 4, 2012
- last permit issued
- Mar 29, 2012
- completed
- 13.1K
- cumulative oil, bbl
- 332K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 29, 2012
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Smith, Joe O-14-8762 | Hansford (Marmaton) | Mewbourne Oil Company | 1 | 13.1K | 12.3K | Jul 2012 – Jul 2026 |
| Smith, Joe G-14-28271 | Hansford (Morrow, Upper) | Strat Land Exploration Company | 1 | 0 | 319K | Jan 1993 – Jun 2012 |
Oil, barrels lease total
Last 12 months 756 · prior 12 1,047(-28%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kimbell Oil Company of TexasApr 1993 → Mar 1994
- 2Texas Consolidated Pet. Corp.Apr 1994 → Dec 2011
- 3Strat Land Exploration CompanyJul 2012 → Sep 2022
- 4Mewbourne Oil CompanyOct 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 740060-99 | Recompletion | Strat Land Exploration Company | May 7, 2012 | Jun 4, 2012 | Jun 12, 2012 | 7,600 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-28271 | — | — | — | — |
| — | — O-14-8762 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,091 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Douglas | 5,022 | -1,931 |
| Morrow | 7,218 | -4,127 |
| MississippianMISSISSIPPI | 7,913 | -4,822 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,518 | 6,544 | Open hole |
| 7,314 | 7,354 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,505 | 12.25 | 500 S |
| 4.5 | 7,600 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 11, 2013 | Sep 4, 2013 | Yes |
| 00 | May 14, 2013 | Aug 24, 2012 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-195-00246 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-195-00246 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19500246, documented in the API reference.