WELL · 42-195-00340 · DISTRICT 10
Odc #1
Hansford County · Hansford (Morrow Upper) field · Vertical
Odc #1 (API 42-195-00340) is a plugged well in Hansford County, plugged July 29, 2013, last operated by Sidwell Operating Company L.P..
The RRC has issued 2 drilling permits between 1982 and 1989, permitted to 7,168 ft.
It was permitted by Sidwell Oil & Gas, Inc. and has since transferred to Sidwell Operating Company L.P. on the wellbore schedule.
Operator of record
Sidwell Operating Company L.P.
Permitted by Sidwell Oil & Gas, Inc.; the EWA schedule now lists a different operator.
Amarillo, TX · P-5 Y, filed Feb 4, 2026 · (806) 679-5653
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sidwell Operating Company L.P. |
| Production reports | Sidwell Operating Company, L.P.through Jul 2013 |
| Latest permit | Sidwell Oil & Gas, Inc.Aug 2, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,168
- total depth, ft
- 2
- permits on file
- Aug 2, 1989
- last permit issued
- Oct 28, 1989
- completed
- 0
- cumulative oil, bbl
- 138K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 28, 1989
- Shut in
- —
- Plugged
- Jul 29, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Odc G-14-132677 | Hansford (Morrow, Upper) | Sidwell Operating Company, L.P. | 1 | 0 | 138K | Jan 1993 – Jan 2014 |
| — G-14-101512 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sidwell Oil & Gas, Inc.Jan 1993 → Jan 2004
- 2Sidwell Operating Company, L.P.Feb 2004 → Jul 2013
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 362056-99 | Recompletion | Sidwell Oil & Gas, Inc. | Jul 28, 1989 | Aug 2, 1989 | — | 7,168 |
| 158127-99 | Recompletion | Sidwell Oil & Gas, Inc. | Apr 26, 1982 | Apr 26, 1982 | — | 7,168 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-101512 | — | — | — | — |
| — | — G-14-132677 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,336 | 6,341 | Perforated |
| 7,044 | 7,049 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,645 | 12.25 | 3,150 S |
| 2.375 | 6,291 | — | — |
| 4.5 | 7,168 | 7.875 | 250 S |
| 4.5 | — | 7.625 | 2,500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 22, 1990 | Nov 17, 1989 | Yes |
| 00 | Jan 9, 1990 | — | — |
| 00 | Jan 12, 1984 | Jun 11, 1982 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-195-00340 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-195-00340 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19500340, documented in the API reference.