WELL · 42-195-30920 · DISTRICT 10
Cator #1
Hansford County · Hannas Draw (Hugoton) field · Vertical
Cator #1 (API 42-195-30920) is a plugged well in Hansford County, plugged January 18, 2002, last operated by Harmon C. E. Oil Inc..
The RRC has issued one drilling permit, issued February 15, 1984, permitted to 7,200 ft.
It was permitted by Cambridge & Nail and has since transferred to Harmon C. E. Oil Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Brown Dolomite, Douglas, 13 Finger Ls, Morrow.
Operator of record
Permitted by Cambridge & Nail; the EWA schedule now lists a different operator.
Tulsa, OK · P-5 Y, filed Dec 6, 2019 · 13 permits on file · (918) 663-8515
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Harmon C. E. Oil Inc. |
| Production reports | Hugoton Energy Corporationthrough Jul 1997 |
| Latest permit | Cambridge & NailFeb 15, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,200
- total depth, ft
- 1
- permits on file
- Feb 15, 1984
- last permit issued
- Apr 17, 1984
- completed
- 0
- cumulative oil, bbl
- 44.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 17, 1984
- Shut in
- —
- Plugged
- Jan 18, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cator G-14-111023 | Hannas Draw (Hugoton) | Harmon, C. E. Oil, Inc. | 1 | 0 | 44.7K | Jan 1993 – Jan 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cambridge Production, Inc.Jan 1993 → Feb 1993
- 2Hugoton Energy CorporationMar 1993 → Jul 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 229613-99 | Drill | Cambridge & Nail | Feb 15, 1984 | Feb 15, 1984 | — | 7,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-111023 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,229 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown Dolomite | 2,994 | 235 |
| Douglas | 4,768 | -1,539 |
| 13 Finger LS | 6,524 | -3,295 |
| MorrowMORROW SHALE | 6,610 | -3,381 |
| MississippianMISS CHESTER | 6,998 | -3,769 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,024 | 3,042 | Perforated |
| 3,050 | 3,068 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,821 | 12.25 | 1,000 sx |
| 4.5 | 3,240 | 7.875 | 175 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 26, 1984 | Apr 30, 1984 | — |
| 00 | Jun 30, 1984 | Apr 30, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-195-30920 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-195-30920 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19530920, documented in the API reference.