WELL · 42-195-30997 · DISTRICT 10

Allar #1

Y

Hansford County · Hannas Draw (Hugoton) field · Temp Abandoned  · Vertical

Allar #1 (API 42-195-30997) is a well in Hansford County operated by Petro Haley, completed February 10, 1987 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued November 4, 1986, permitted to 3,100 ft.

It was permitted by Cambridge & Nail and has since transferred to Petro Haley on the wellbore schedule.

Completion filings report one formation top, including Brown Dolomite.

No lease production has been reported under this well’s leases.

Operator of record

Petro Haley

Permitted by Cambridge & Nail; the EWA schedule now lists a different operator.

Borger, TX · P-5 Y, filed Jul 4, 2026 · 1 permits on file · (806) 273-9796

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetro Haley
Production reportsPetro Haleythrough May 2009
Latest permitCambridge & NailNov 4, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,100
total depth, ft
1
permits on file
Nov 4, 1986
last permit issued
Feb 10, 1987
completed
0
cumulative oil, bbl
54.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 10, 1987
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Allar G-14-124122Hannas Draw (Hugoton)Petro Haley1054.4KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cambridge Production, Inc.Jan 1993 → Feb 1993
  2. 2Hugoton Energy CorporationMar 1993 → Sep 1995
  3. 3Petro HaleyFeb 1996 → May 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
322614-99DrillCambridge & NailNov 3, 1986Nov 4, 1986—3,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-14-124122————

Formation tops

As filed on W-2/G-1. Subsea from 3,273 ft elevation.Download CSV →

FormationMD ftSubsea
Brown Dolomite3,20568

Perforations

Perforated and open-hole intervals.

FromToType
3,0303,036Perforated
3,0403,050Perforated
3,0803,098Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62564712.25260 S
5.53,1897.875125 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 11, 1987May 7, 1987Yes
00Jun 10, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19530997, documented in the API reference.