WELL · 42-195-31593 · DISTRICT 10
Hand #1
Hansford County · Wildcat field · Vertical
Hand #1 (API 42-195-31593) is a well in Hansford County operated by Pablo Energy Inc., completed February 8, 2003.
The RRC has issued 2 drilling permits between 2003 and 2004, permitted to 8,500 ft.
Completion filings report 6 formation tops, including Dolomite, Douglas, Cleveland, Marmaton.
No lease production has been reported under this well’s leases.
Operator of record
Pampa, TX · P-5 Y, filed Dec 2, 2005 · 60 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pablo Energy Inc. |
| Production reports | Westwind Oil and Gas Inc.through Nov 2012 |
| Latest permit | Pablo Energy, Inc.Jan 23, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,500
- total depth, ft
- 2
- permits on file
- Jan 23, 2004
- last permit issued
- Feb 8, 2003
- completed
- 0
- cumulative oil, bbl
- 45.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2003 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 8, 2003
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hand G-14-203360 | Hansford (Morrow, Upper) | Wakita Operating, LLC | 1 | 0 | 45.8K | Jun 2004 – Jul 2026 |
| Hand G-14-197573 | Wildcat | Pablo Energy, Inc. | 1 | 0 | 0 | Feb 2003 – Jun 2004 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pablo Energy, Inc.Jun 2004 → Dec 2005
- 2Pablo Energy II, LLCJan 2006 → Dec 2008
- 3Westwind Oil and Gas Inc.Jan 2009 → Nov 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 539485-99 | Recompletion | Pablo Energy, Inc. | Dec 9, 2003 | Jan 23, 2004 | — | 8,270 |
| 527509-99 | Drill | Pablo Energy, Inc. | Jan 21, 2003 | Jan 27, 2003 | Feb 8, 2003 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-197573 | — | — | — | — |
| — | — G-14-203360 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,123 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Dolomite | 3,200 | -77 |
| Douglas | 5,078 | -1,955 |
| Cleveland | 6,250 | -3,127 |
| Marmaton | 6,520 | -3,397 |
| Morrow | 6,790 | -3,667 |
| Mississippian | 7,884 | -4,761 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,298 | 7,317 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,656 | 12.25 | 745 S |
| 5.5 | 7,458 | 7.875 | 330 S |
| 5.5 | — | 7.875 | 110 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 21, 2004 | Aug 10, 2004 | Yes |
| 00 | Sep 21, 2004 | — | — |
| 00 | Nov 24, 2003 | Sep 30, 2003 | Yes |
| 00 | Nov 13, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-195-31593 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-195-31593 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19531593, documented in the API reference.