WELL · 42-195-31650 · DISTRICT 10
Flowers #1037
Hansford County · Clementine (Novi) field · Vertical
Flowers #1037 (API 42-195-31650) is a plugged well in Hansford County, plugged May 21, 2014, last operated by Zenergy Inc..
The RRC has issued 2 drilling permits (amended twice) between 2004 and 2006, permitted to 7,400 ft.
Completion filings report 6 formation tops, including Douglas, Tonkawa, Kansas City, Cherokee.
Operator of record
Tulsa, OK · P-5 Y, filed Jan 6, 2017 · 25 permits on file · (918) 488-6400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Zenergy Inc. |
| Production reports | Zenergy, Inc.through Jan 2014 |
| Latest permit | Zinke & Trumbo, Inc.Apr 27, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,400
- total depth, ft
- 4
- permits on file
- Apr 27, 2006
- last permit issued
- May 26, 2006
- completed
- 0
- cumulative oil, bbl
- 92.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2004 THROUGH Dec 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 26, 2006
- Shut in
- —
- Plugged
- May 21, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Flowers G-14-222906 | Clementine (Novi) | Zenergy, Inc. | 1 | 0 | 71K | May 2006 – Dec 2014 |
| Flowers G-14-203211 | Brillhart (Morrow, Upper) | Zenergy, Inc. | 1 | 0 | 21.7K | Mar 2004 – May 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Zinke & Trumbo, Inc.May 2004 → Mar 2006
- 2Zenergy, Inc.May 2006 → Jan 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 618278-98 | Recompletion | Zenergy, Inc. | Nov 1, 2006 | Apr 27, 2006 | — | 6,750 |
| 618278-99 | Recompletion | Zinke & Trumbo, Inc. | Apr 26, 2006 | Apr 27, 2006 | — | 6,700 |
| 541329-98 | Drill | Zinke & Trumbo, Inc. | May 5, 2004 | Jan 28, 2004 | Feb 7, 2004 | 7,400 |
| 541329-99 | Drill | Zinke & Trumbo, Inc. | Jan 28, 2004 | Jan 28, 2004 | — | 7,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-203211 | — | — | — | — |
| — | — G-14-222906 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,023 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Douglas | 4,830 | -1,807 |
| Tonkawa | 5,115 | -2,092 |
| Kansas City | 5,240 | -2,217 |
| Cherokee | 6,480 | -3,457 |
| Atoka | 6,645 | -3,622 |
| MorrowUPPER MORROW SD | 6,807 | -3,784 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,589 | 6,599 | Perforated |
| 6,824 | 6,844 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,650 | 12.25 | 750 S |
| 4.5 | 7,396 | 7.875 | 205 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 29, 2007 | Nov 1, 2006 | Yes |
| 00 | Dec 7, 2006 | — | — |
| 00 | Oct 18, 2004 | Apr 2, 2004 | Yes |
| 00 | Sep 9, 2004 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-195-31650 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-195-31650 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19531650, documented in the API reference.