WELL · 42-195-31751 · DISTRICT 10
Allar-Clawson #2207
Hansford County · Farwell Creek N. (Morrow Upper) field · Producing · Vertical
Allar-Clawson #2207 (API 42-195-31751) is a well in Hansford County operated by Bracken Operating L.L.C., completed November 7, 2006 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued June 12, 2006, permitted to 7,450 ft.
It was permitted by Zenergy, Inc. and has since transferred to Bracken Operating L.L.C. on the wellbore schedule.
Completion filings report 4 formation tops, including Douglas, Tonkawa, Marmaton, Morrow.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Zenergy, Inc.; the EWA schedule now lists a different operator.
Perryton, TX · P-5 Y, filed Dec 4, 2025 · 140 permits on file · (806) 228-0138
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bracken Operating L.L.C. |
| Production reports | Bracken Operating, L.L.C.through Feb 2026 |
| Latest permit | Zenergy, Inc.Jun 12, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,450
- total depth, ft
- 1
- permits on file
- Jun 12, 2006
- last permit issued
- Nov 7, 2006
- completed
- 0
- cumulative oil, bbl
- 1.2M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 7, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Allar-Clawson G-14-224985 | Farwell Creek N. (Morrow Upper) | Bracken Operating, L.L.C. | 1 | 0 | 1.2M | Nov 2006 – Jul 2026 |
Gas, mcf lease total
Last 12 months 4,754 · prior 12 3,248(+46%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Zenergy, Inc.Nov 2006 → Nov 2015
- 2JCB II Enterprises, LLCDec 2015 → May 2021
- 3Bracken Operating, L.L.C.Jun 2021 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 620177-99 | Drill | Zenergy, Inc. | May 31, 2006 | Jun 12, 2006 | Aug 1, 2006 | 7,450 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-224985 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,272 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,292 | 7,298 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,599 | 12.25 | 725 S |
| 4.5 | 7,540 | 7.875 | 210 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 17, 2007 | Jan 29, 2007 | Yes |
| 00 | Mar 5, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-195-31751 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-195-31751 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19531751, documented in the API reference.