WELL · 42-195-31941 · DISTRICT 10
Jackhammer 107 #1H
Hansford County · Allen-Parker (Marmaton) field · Producing · Horizontal
Jackhammer 107 #1H (API 42-195-31941) is a horizontal well in Hansford County operated by Presidio Petroleum LLC, completed May 20, 2018 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued February 16, 2018, permitted to 9,000 ft.
It was permitted by Le Norman Operating LLC and has since transferred to Presidio Petroleum LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Brown Dolomite, Ft Riley, Wolfcamp, Council Grove - H2s Corrosive.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by LE Norman Operating LLC; the EWA schedule now lists a different operator.
Canadian, TX · P-5 Y, filed Feb 4, 2026 · 13 permits on file · (800) 461-1604
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Presidio Petroleum LLC |
| Production reports | Presidio Petroleum LLCthrough Apr 2026 |
| Latest permit | LE Norman Operating LLCFeb 16, 2018 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Feb 16, 2018
- last permit issued
- May 20, 2018
- completed
- 0
- cumulative oil, bbl
- 130K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2018 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- May 20, 2018
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
36.255850, -101.306914
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Hansford County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jackhammer 107 G-14-285502 | Allen-Parker (Marmaton) | Presidio Petroleum LLC | 1 | 0 | 130K | May 2018 – Jul 2026 |
Gas, mcf lease total
Last 12 months 2,347 · prior 12 3,351(-30%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1LE Norman Operating LLCMay 2018 → Jun 2019
- 2Templar Operating LLCJul 2019 → Dec 2019
- 3Presidio Petroleum LLCJan 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 836350-99 | Drill | LE Norman Operating LLC | Feb 13, 2018 | Feb 16, 2018 | Apr 12, 2018 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-14-285502 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,135 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brown DolomiteBROWN DOLOMITE - H2S CORROSIVE | 3,151 | -16 |
| FT Riley | 4,137 | -1,002 |
| WolfcampWOLFCAMP - H2S CORROSIVE | 4,206 | -1,071 |
| Council Grove - H2S Corrosive | 4,421 | -1,286 |
| CiscoCISCO (VIRGIL) | 4,585 | -1,450 |
| Collier Lime | 4,688 | -1,553 |
| DouglasDOUGLAS - H2S CORROSIVE | 4,807 | -1,672 |
| Lansing Lime (Kansas City) | 4,924 | -1,789 |
| Tonkawa | 5,244 | -2,109 |
| Cleveland | 6,035 | -2,900 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,490 | 10,930 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,466 | 12.25 | 820 S |
| 7 | 6,490 | 8.75 | 310 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 16, 2019 | Nov 14, 2018 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-195-31941 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-195-31941 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
Ayres 79V42-195-31957
7.6 KM · King Operating Corporation · Section with this well →
| Brown Dolomite | 3,125 | -24 |
| Douglas | 4,900 | -1,799 |
| Tonkawa | 5,255 | -2,154 |
| Lansing Lime (Kansas City) | 5,500 | -2,399 |
| Cleveland | 5,855 | -2,754 |
| FT Riley | — | |
| Wolfcamp | — | |
| Cisco | — |
11 TOPS · FIRST 8
Beauchamp 6042-195-31945
8.5 KM · LE Norman Operating LLC · Section with this well →
| Brown Dolomite | 3,280 | -195 |
| FT Riley | 4,081 | -996 |
| Wolfcamp | 4,163 | -1,078 |
| Council Grove - H2S Corrosive | 4,370 | -1,285 |
| Cisco | 4,600 | -1,515 |
| Collier Lime | 4,925 | -1,840 |
| Douglas | 4,964 | -1,879 |
| Lansing Lime (Kansas City) | 5,305 | -2,220 |
10 TOPS · FIRST 8
Holt42-195-31926
10.1 KM · Remnant Energy, Inc. · Section with this well →
| Brown Dolomite | 2,946 | 120 |
| Wolfcamp | 3,286 | -220 |
| FT Riley | 3,550 | -484 |
| Council Grove - H2S Corrosive | 3,605 | -539 |
| Collier Lime | 4,590 | -1,524 |
| Cisco | 4,640 | -1,574 |
| Douglas | 4,864 | -1,798 |
| Lansing Lime (Kansas City) | 5,040 | -1,974 |
10 TOPS · FIRST 8
Rock Bottom 8742-195-31944
10.3 KM · LE Norman Operating LLC · Section with this well →
| Brown Dolomite | 2,966 | -37 |
| FT Riley | 3,995 | -1,066 |
| Wolfcamp | 4,054 | -1,125 |
| Council Grove - H2S Corrosive | 4,240 | -1,311 |
| Cisco | 4,470 | -1,541 |
| Collier Lime | 4,795 | -1,866 |
| Douglas | 4,817 | -1,888 |
| Lansing Lime (Kansas City) | 5,593 | -2,664 |
10 TOPS · FIRST 8
Robertson Lee J42-195-31942
10.5 KM · J-Brex Company · Section with this well →
| Brown Dolomite | 3,152 | -74 |
| Douglas | 5,014 | -1,936 |
| Tonkawa | 5,377 | -2,299 |
| Lansing Lime (Kansas City) | 5,623 | -2,545 |
| Cleveland | — | |
| Collier Lime | — | |
| Council Grove - H2S Corrosive | — | |
| FT Riley | — |
10 TOPS · FIRST 8
Holt 16242-195-31938
10.9 KM · Remnant Energy, Inc. · Section with this well →
| Brown Dolomite | 3,075 | 84 |
| Wolfcamp | 3,260 | -101 |
| FT Riley | 3,550 | -391 |
| Council Grove - H2S Corrosive | 3,722 | -563 |
| Collier Lime | 4,590 | -1,431 |
| Cisco | 4,640 | -1,481 |
| Douglas | 4,800 | -1,641 |
| Lansing Lime (Kansas City) | 5,040 | -1,881 |
10 TOPS · FIRST 8
O'Loughlin 6742-195-31936
11.3 KM · Mewbourne Oil Company · Section with this well →
| Brown Dolomite | 3,140 | -70 |
| Council Grove - H2S Corrosive | 3,750 | -680 |
| Douglas | 4,957 | -1,887 |
| Tonkawa | 5,364 | -2,294 |
| Lansing Lime (Kansas City) | 5,517 | -2,447 |
| Cleveland | 5,944 | -2,874 |
| Collier Lime | — | |
| Cisco | — |
10 TOPS · FIRST 8
Holt 16242-195-31950
11.6 KM · Remnant Energy, Inc. · Section with this well →
| Brown Dolomite | 3,120 | 68 |
| Wolfcamp | 3,470 | -282 |
| Council Grove - H2S Corrosive | 3,742 | -554 |
| Collier Lime | 4,590 | -1,402 |
| Cisco | 4,640 | -1,452 |
| Douglas | 4,978 | -1,790 |
| Lansing Lime (Kansas City) | 5,040 | -1,852 |
| Tonkawa | 5,100 | -1,912 |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19531941, documented in the API reference.