WELL · 42-197-30352 · DISTRICT 9

Holcomb #2

Plugged

Hardeman County · Allred (Mississippi) field  · Vertical

Holcomb #2 (API 42-197-30352) is a plugged well in Hardeman County, plugged July 10, 1991, last operated by Trio Consulting & Management LLC.

The RRC has issued one drilling permit, issued June 13, 1980, permitted to 8,600 ft.

It was permitted by Lillis, Michael D. and has since transferred to Trio Consulting & Management LLC on the wellbore schedule.

Completion filings report one formation top, including Mississippian.

Its lease has reported 44.8K barrels of oil and 1.33K mcf of gas since January 1993, last reporting in October 2022. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Trio Consulting & Management LLC

Permitted by Lillis, Michael D.; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Aug 4, 2025 · 351 permits on file · (800) 435-2757

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrio Consulting & Management LLC
Production reportsTrio Consulting & Management,llcthrough Jan 2020
Latest permitLillis, Michael D.Jun 13, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,600
total depth, ft
1
permits on file
Jun 13, 1980
last permit issued
Jun 15, 1981
completed
44.8K
cumulative oil, bbl
1.33K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2022

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 15, 1981
Shut in
—
Plugged
Jul 10, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Holcomb O-13-19605Allred (Mississippi)Trio Consulting & Management,llc244.8K1.33KJan 1993 – Oct 2022

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lillis, Michael D.Jan 1993 → Jul 2013
  2. 2Trio Consulting & Management,llcApr 2014 → Jan 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
83857-99DrillLillis, Michael D.Jun 13, 1980Jun 13, 1980Apr 1, 19818,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-19605————

Formation tops

As filed on W-2/G-1. Subsea from 1,544 ft elevation.Download CSV →

FormationMD ftSubsea
MississippianMISS.8,410-6,866

Perforations

Perforated and open-hole intervals.

FromToType
—8,826Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62529010.75225 S
4.58,7947.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 9, 1991Feb 6, 1991—
00Jan 12, 1984Jun 14, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Oct 1990
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000044221W-14 DisposalPlugged Jul 24, 19914001502,750–2,850

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011990

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19730352, documented in the API reference.