WELL · 42-197-30578 · DISTRICT 9

Jeffery #10

Plugged

Hardeman County · Quanah field  · Vertical

Jeffery #10 (API 42-197-30578) is a plugged well in Hardeman County, plugged May 1, 1996, last operated by Menasco J..

The RRC has issued 2 drilling permits between 1983 and 2025, permitted to 6,500 ft.

It was permitted by Sutherland Energy CO., LLC and has since transferred to Menasco J. on the wellbore schedule.

Completion filings report 2 formation tops, including Coleman Junction, Palo Pinto.

Its 2 leases have reported 62.8K barrels of oil and 5.97K mcf of gas since January 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 2.59K barrels injected in the 12 months reported through February 2026.

Operator of record

Menasco J.

Permitted by Sutherland Energy Co., LLC; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed May 12, 2020 · 41 permits on file · (940) 636-3853

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMenasco J.
Production reportsSutherland Energy Co., LLCthrough Apr 2026
Latest permitSutherland Energy Co., LLCMay 22, 2025

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
2
permits on file
May 22, 2025
last permit issued
Aug 17, 1983
completed
62.8K
cumulative oil, bbl
5.97K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 17, 1983
Shut in
—
Plugged
May 1, 1996

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Qeru O-13-34107QuanahSutherland Energy Co., LLC960.7K5.93KDec 2021 – Jul 2026
Jeffery O-13-23543QuanahMenasco, J.12.12K40Jan 1993 – Jul 1996

Oil, barrels lease total

Last 12 months 15,506 · prior 12 19,065(-19%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 899 · prior 12 1,019(-12%)

0200400202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Menasco, J.Jan 1993 → Jan 1996
  2. 2Sutherland Energy Co., LLCDec 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
907926-99ReenterSutherland Energy Co., LLCMay 12, 2025May 22, 2025Jul 15, 20256,500
197968-99DrillCrawford Energy, Inc.Jan 25, 1984Jun 7, 1983—5,955

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-23543————
—— O-13-34107————

Formation tops

As filed on W-2/G-1. Subsea from 2,443 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction2,756-313
Palo Pinto5,900-3,457
Palo Pinto5,902-3,459

Perforations

Perforated and open-hole intervals.

FromToType
5,9025,912Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62534812.25220 S
4.55,9507.875175 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 6, 2026Jul 13, 2026—
00Jun 3, 2026Apr 14, 2026—
00Feb 23, 1984Aug 24, 1983—
00Feb 22, 1984Aug 24, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.59K
bbl, last 12 reported months
2.59K
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000127289H-1 InjectionActive2,5002,9005,800–5,950

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 2,590

01K2K3K2026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19730578, documented in the API reference.