WELL · 42-197-30705 · DISTRICT 13

Kyle Evans #1

Plugged

Hardeman County  · Directional

Kyle Evans #1 (API 42-197-30705) is a plugged well in Hardeman County, plugged September 6, 2021, last operated by Roberts & Hammack Inc..

The RRC has issued 3 drilling permits between 1984 and 2021, permitted to 9,100 ft.

Operator of record

Roberts & Hammack Inc.

Dallas, TX · P-5 Y, filed Jul 4, 2026 · 28 permits on file · (214) 534-8862

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitRoberts & Hammack Inc.Jul 30, 2021
9,100
total depth, ft
3
permits on file
Jul 30, 2021
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 6, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
871600-99ReenterRoberts & Hammack Inc.Jul 29, 2021Jul 30, 2021Sep 3, 20218,625
369197-99ReenterFarrex, Inc.Jan 29, 1990Feb 2, 1990—3,000
244082-99DrillEnserch Exploration, IncJun 8, 1984Jun 8, 1984—9,100

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
158K
bbl, all reported
Feb 1999
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000072473W-14 DisposalCanceled Sep 29, 19994005002,800–2,850

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011999

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19730705, documented in the API reference.