WELL · 42-197-30765 · DISTRICT 9
RRR Judd #1A
Hardeman County · Vertical
Rrr Judd #1A (API 42-197-30765) is a plugged well in Hardeman County, plugged October 11, 1984, last operated by Rrr Exploration, Inc..
The RRC has issued 2 drilling permits between 1984 and 1985, permitted to 9,300 ft.
Its 2 leases have reported 70.4K barrels of oil and 152 mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Dallas, TX · P-5 Y, filed Mar 3, 1995 · 6 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Assent Energy Partners, LLCthrough Apr 2026 |
| Latest permit | RRR Exploration, Inc.Aug 22, 1985 |
- 9,300
- total depth, ft
- 2
- permits on file
- Aug 22, 1985
- last permit issued
- —
- completed
- 70.4K
- cumulative oil, bbl
- 152
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Oct 11, 1984
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Judd O-13-30538 | Trailer (Holmes) | Assent Energy Partners, LLC | 1 | 27.3K | 0 | Jul 2005 – Jul 2026 |
| Judd O-13-25631 | Holmes, E. (7750) | Cimarex Energy Co. | 1 | 43.1K | 152 | Jan 1993 – Jun 2006 |
Oil, barrels lease total
Last 12 months 677 · prior 12 1,400(-52%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1RRR Exploration, Inc.Jan 1993 → May 1994
- 2Farrex, Inc.Jun 1994 → Jun 1994
- 3Farrell Oil CompanyJul 1994 → Jul 2002
- 4Masada Oil & GasAug 2002 → Sep 2005
- 5Cimarex Energy Co.May 2006 → Nov 2013
- 6Eagle Energy Acquisitions LPDec 2013 → Aug 2014
- 7Eagle Hydrocarbons (Texas) Inc.Sep 2014 → Mar 2015
- 8Eagle Hydrocarbons Inc.Apr 2015 → Jun 2020
- 9Assent Energy Partners, LLCJul 2020 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 283280-99 | Other | RRR Exploration, Inc. | Aug 22, 1985 | Aug 22, 1985 | — | 7,800 |
| 251536-99 | Drill | Bennett Resources, Inc. | Sep 17, 1984 | Sep 17, 1984 | — | 9,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-25631 | — | — | — | — |
| — | — O-13-30538 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,575 | 7,585 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 512 | 13.5 | 465 S |
| 4.5 | 7,753 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 17, 2006 | Sep 23, 1985 | Yes |
| 00 | Oct 4, 1985 | Sep 23, 1985 | Yes |
| 00 | Oct 2, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-30765 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-30765 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19730765, documented in the API reference.