WELL · 42-197-30945 · DISTRICT 9

Parker #1

Plugged

Hardeman County · Quanah field  · Vertical

Parker #1 (API 42-197-30945) is a plugged well in Hardeman County, plugged February 19, 1991, last operated by Trio Consulting & Management LLC.

The RRC has issued one drilling permit, issued April 30, 1986, permitted to 9,000 ft.

It was permitted by Farrex, Inc. and has since transferred to Trio Consulting & Management LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Palo Pinto, Maramac, Chappel.

Its lease has reported 10.3K barrels of oil and 21 mcf of gas since January 1993, last reporting in September 2013. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Trio Consulting & Management LLC

Permitted by Farrex, Inc.; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Aug 4, 2025 · 351 permits on file · (800) 435-2757

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrio Consulting & Management LLC
Production reportsTrio Operating Company, Inc.through Jan 1997
Latest permitFarrex, Inc.Apr 30, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Apr 30, 1986
last permit issued
Oct 9, 1986
completed
10.3K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2013

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 9, 1986
Shut in
—
Plugged
Feb 19, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Parker O-13-26397QuanahTrio Consulting & Management,llc410.3K21Jan 1993 – Sep 2013

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Trio Operating Company, Inc.Jan 1993 → Jan 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
301711-99DrillFarrex, Inc.Mar 28, 1986Apr 30, 1986—9,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-26397————

Formation tops

As filed on W-2/G-1. Subsea from 1,441 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO SAND5,820-4,379
Maramac8,330-6,889
Chappel8,478-7,037

Perforations

Perforated and open-hole intervals.

FromToType
5,8225,833Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62530612.75190 S
4.58,7077.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 10, 1986Oct 20, 1986Yes
00Nov 1, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19730945, documented in the API reference.