WELL · 42-197-31036 · DISTRICT 9
Wood, Russell #1A
Hardeman County · Directional
Wood, Russell #1A (API 42-197-31036) is a plugged well in Hardeman County, plugged September 17, 2004, last operated by Kadane Corporation.
The RRC has issued 2 drilling permits between 1987 and 2004, permitted to 8,500 ft.
Completion filings report 3 formation tops, including Chester, Barnett, Meramec Lime.
Its lease has reported 182 barrels of oil since January 1993, last reporting in August 2003.
Operator of record
Dallas, TX · P-5 Y, filed Apr 3, 2020 · 39 permits on file · (214) 546-2258
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Kadane Corporationthrough Dec 2000 |
| Latest permit | Kadane CorporationJul 13, 2004 |
- 8,500
- total depth, ft
- 2
- permits on file
- Jul 13, 2004
- last permit issued
- —
- completed
- 182
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Sep 17, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wood, Russell O-13-26958 | Lucky Boys (Miss.) | Kadane Corporation | 1 | 182 | 0 | Jan 1993 – Aug 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Kadane CorporationDec 2000 → Dec 2000
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 548159-99 | Reenter | Kadane Corporation | Jul 13, 2004 | Jul 13, 2004 | Aug 26, 2004 | 8,500 |
| 336813-99 | Drill | Kadane Oil Company | Oct 2, 1987 | Oct 30, 1987 | — | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26958 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,484 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,287 | 8,291 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 335 | 12.25 | 175 S |
| 4.5 | 8,286 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 12, 1990 | May 14, 1990 | — |
| 00 | Mar 4, 1988 | Feb 10, 1988 | Yes |
| 00 | Mar 1, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31036 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31036 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 219K
- bbl, all reported
- Feb 2000
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000072637 | H-1 Injection | Plugged Jan 12, 2001 | 800 | 1,000 | 8,287–8,291 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731036, documented in the API reference.