WELL · 42-197-31296 · DISTRICT 9
J & J Ranch #1
Hardeman County · Cassie (Chappel) field · Vertical
J & J Ranch #1 (API 42-197-31296) is a plugged well in Hardeman County, plugged July 1, 2009, last operated by Roon Energy Inc..
The RRC has issued one drilling permit, issued September 6, 1994, permitted to 8,200 ft.
It was permitted by Impact Exploration Company and has since transferred to Roon Energy Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Palo Pinto, Mississippian, Barnett.
Its lease has reported 170K barrels of oil and 40 mcf of gas since October 1994, last reporting in October 2009.
Operator of record
Permitted by Impact Exploration Company; the EWA schedule now lists a different operator.
Boones Mill, VA · P-5 Y, filed Mar 4, 2026 · (713) 397-0526
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Roon Energy Inc. |
| Production reports | Roon Energy, Inc.through Mar 2009 |
| Latest permit | Impact Exploration CompanySep 6, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,200
- total depth, ft
- 1
- permits on file
- Sep 6, 1994
- last permit issued
- Oct 4, 1994
- completed
- 170K
- cumulative oil, bbl
- 40
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Oct 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 4, 1994
- Shut in
- —
- Plugged
- Jul 1, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| J & J Ranch O-13-28869 | Cassie (Chappel) | Roon Energy, Inc. | 1 | 170K | 40 | Oct 1994 – Oct 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Impact Exploration CompanyOct 1994 → May 1998
- 2Chesapeake Operating, Inc.Jun 1998 → Mar 1999
- 3Clear Fork, IncorporatedApr 1999 → Feb 2005
- 4Roon Energy, Inc.Mar 2005 → Mar 2009
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 427730-99 | Drill | Impact Exploration Company | Sep 6, 1994 | Sep 6, 1994 | Sep 9, 1994 | 8,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-28869 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,425 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 4,990 | -3,565 |
| MississippianMISS LIME | 7,532 | -6,107 |
| BarnettBARNETT SHALE | 7,650 | -6,225 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,922 | 7,934 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 548 | 12.25 | 250 S |
| 4.5 | 7,922 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 30, 1994 | Oct 28, 1994 | Yes |
| 00 | Nov 16, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31296 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31296 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731296, documented in the API reference.