WELL · 42-197-31298 · DISTRICT 9

Cox #1

Plugged

Hardeman County · Berry West (Congl 7400) field  · Vertical

Cox #1 (API 42-197-31298) is a plugged well in Hardeman County, plugged March 26, 1998, last operated by Thompson Richard W. Inc..

The RRC has issued one drilling permit (amended 3 times), issued September 9, 1994, permitted to 8,700 ft.

Completion filings report 6 formation tops, including Palo Pinto, Marble Falls, Mississippian, Barnett.

Its lease has reported 7.07K barrels of oil and 405 mcf of gas since November 1994, last reporting in April 1998.

Operator of record

Thompson Richard W. Inc.

Plano, TX · P-5 Y, filed Aug 4, 2025 · 68 permits on file · (214) 733-7204

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleThompson Richard W. Inc.
Production reportsThompson, Richard W. Inc.through Nov 1997
Latest permitThompson, Richard W. Inc.Sep 9, 1994
8,700
total depth, ft
4
permits on file
Sep 9, 1994
last permit issued
Nov 16, 1994
completed
7.07K
cumulative oil, bbl
405
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 1994 THROUGH Apr 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 16, 1994
Shut in
—
Plugged
Mar 26, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cox O-13-28915Berry, West (Congl 7400)Thompson, Richard W. Inc.17.07K405Nov 1994 – Apr 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thompson, Richard W. Inc.Nov 1994 → Nov 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
427831-96DrillThompson, Richard W. Inc.Feb 6, 1995Sep 9, 1994Sep 20, 19948,700
427831-97DrillThompson, Richard W. Inc.Nov 30, 1994Sep 9, 1994—8,700
427831-98DrillThompson, Richard W. Inc.Sep 26, 1994Sep 9, 1994—8,700
427831-99DrillThompson, Richard W. Inc.Sep 8, 1994Sep 9, 1994—8,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-28915————

Formation tops

As filed on W-2/G-1. Subsea from 1,420 ft elevation.Download CSV →

FormationMD ftSubsea
Palo Pinto5,340-3,920
Marble FallsBASE MARBLE FALLS7,718-6,298
MississippianTOP OF MISSISSIPPI7,718-6,298
BarnettBARNETT SHALE7,946-6,526
BarnettBASE BARNETT TOP CHESTER7,996-6,576
Meramec8,110-6,690
Chappel8,166-6,746

Perforations

Perforated and open-hole intervals.

FromToType
7,4217,431Perforated
7,4567,474Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62554212.25210 S
4.58,3867.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 16, 1995Dec 13, 1994—
00Feb 16, 1995—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19731298, documented in the API reference.