WELL · 42-197-31318 · DISTRICT 9
Neal 2 #1
Hardeman County · Bbbb (Congl.) field · Shut IN · Vertical
Neal 2 #1 (API 42-197-31318) is a well in Hardeman County operated by Assent Energy Partners LLC, completed January 6, 1996 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued January 18, 1995, permitted to 9,000 ft.
It was permitted by E.G. Operating and has since transferred to Assent Energy Partners LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Morrow, Merrimac Lm, Chappel.
Its lease has reported 143K barrels of oil and 166K mcf of gas since January 1996, last reporting in July 2026.
Operator of record
Permitted by E.G. Operating; the EWA schedule now lists a different operator.
College Sta, TX · P-5 Y, filed Feb 4, 2026 · 3 permits on file · (281) 705-2996
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Assent Energy Partners LLC |
| Production reports | Assent Energy Partners, LLCthrough Aug 2023 |
| Latest permit | E.G. OperatingJan 18, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- Jan 18, 1995
- last permit issued
- Jan 6, 1996
- completed
- 143K
- cumulative oil, bbl
- 166K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 6, 1996
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Neal 2 O-13-29101 | Bbbb (Congl.) | Assent Energy Partners, LLC | 1 | 143K | 166K | Jan 1996 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1E.G. OperatingJan 1996 → Jun 1997
- 2Vista Resources, Inc. (A)Jul 1997 → Feb 2000
- 3Prize Operating CompanyMar 2000 → Mar 2002
- 4Gruy Petroleum Management Co.Apr 2002 → Apr 2006
- 5Cimarex Energy Co. of ColoradoMay 2006 → Nov 2013
- 6Eagle Energy Acquisitions LPDec 2013 → Aug 2014
- 7Eagle Hydrocarbons (Texas) Inc.Sep 2014 → Mar 2015
- 8Eagle Hydrocarbons Inc.Apr 2015 → Jun 2020
- 9Assent Energy Partners, LLCJul 2020 → Aug 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 431629-99 | Drill | E.G. Operating | Jan 9, 1995 | Jan 18, 1995 | Oct 23, 1995 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-29101 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,571 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Morrow | 7,459 | -5,888 |
| Merrimac LM | 8,033 | -6,462 |
| Chappel | 8,124 | -6,553 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,410 | 7,422 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 537 | 12.25 | 235 S |
| 4.5 | 7,607 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 1996 | Jan 16, 1996 | Yes |
| 00 | Mar 14, 1996 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31318 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31318 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731318, documented in the API reference.