WELL · 42-197-31318 · DISTRICT 9

Neal 2 #1

Y

Hardeman County · Bbbb (Congl.) field · Shut IN  · Vertical

Neal 2 #1 (API 42-197-31318) is a well in Hardeman County operated by Assent Energy Partners LLC, completed January 6, 1996 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued January 18, 1995, permitted to 9,000 ft.

It was permitted by E.G. Operating and has since transferred to Assent Energy Partners LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Morrow, Merrimac Lm, Chappel.

Its lease has reported 143K barrels of oil and 166K mcf of gas since January 1996, last reporting in July 2026.

Operator of record

Assent Energy Partners LLC

Permitted by E.G. Operating; the EWA schedule now lists a different operator.

College Sta, TX · P-5 Y, filed Feb 4, 2026 · 3 permits on file · (281) 705-2996

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAssent Energy Partners LLC
Production reportsAssent Energy Partners, LLCthrough Aug 2023
Latest permitE.G. OperatingJan 18, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
1
permits on file
Jan 18, 1995
last permit issued
Jan 6, 1996
completed
143K
cumulative oil, bbl
166K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 6, 1996
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Neal 2 O-13-29101Bbbb (Congl.)Assent Energy Partners, LLC1143K166KJan 1996 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

024202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1E.G. OperatingJan 1996 → Jun 1997
  2. 2Vista Resources, Inc. (A)Jul 1997 → Feb 2000
  3. 3Prize Operating CompanyMar 2000 → Mar 2002
  4. 4Gruy Petroleum Management Co.Apr 2002 → Apr 2006
  5. 5Cimarex Energy Co. of ColoradoMay 2006 → Nov 2013
  6. 6Eagle Energy Acquisitions LPDec 2013 → Aug 2014
  7. 7Eagle Hydrocarbons (Texas) Inc.Sep 2014 → Mar 2015
  8. 8Eagle Hydrocarbons Inc.Apr 2015 → Jun 2020
  9. 9Assent Energy Partners, LLCJul 2020 → Aug 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
431629-99DrillE.G. OperatingJan 9, 1995Jan 18, 1995Oct 23, 19959,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-29101————

Formation tops

As filed on W-2/G-1. Subsea from 1,571 ft elevation.Download CSV →

FormationMD ftSubsea
Morrow7,459-5,888
Merrimac LM8,033-6,462
Chappel8,124-6,553

Perforations

Perforated and open-hole intervals.

FromToType
7,4107,422Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62553712.25235 S
4.57,6077.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 1996Jan 16, 1996Yes
00Mar 14, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19731318, documented in the API reference.