WELL · 42-197-31442 · DISTRICT 9
J & J Ranch #1SD
Hardeman County · Vertical
J & J Ranch #1SD (API 42-197-31442) is a plugged well in Hardeman County, plugged August 25, 1998, last operated by Corda Corporation.
The RRC has issued 2 drilling permits between 1998 and 2004, permitted to 8,500 ft.
Completion filings report one formation top, including Coleman Junction.
Its lease has reported 146K barrels of oil and 44.7K mcf of gas since September 1995, last reporting in November 2017. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Wichita Falls, TX · P-5 Y, filed Sep 4, 2025 · 104 permits on file · (940) 733-1172
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Corda Corporationthrough May 2017 |
| Latest permit | Corda CorporationNov 29, 2004 |
- 8,500
- total depth, ft
- 2
- permits on file
- Nov 29, 2004
- last permit issued
- —
- completed
- 146K
- cumulative oil, bbl
- 44.7K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1995 THROUGH Nov 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 25, 1998
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| J & J Ranch O-13-29023 | Cassie (Chappel) | Corda Corporation | 2 | 146K | 44.7K | Sep 1995 – Nov 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Corda CorporationSep 1995 → May 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 553980-99 | Reenter | Corda Corporation | Nov 22, 2004 | Nov 29, 2004 | May 3, 2005 | 2,400 |
| 478621-99 | Drill | Key Energy of Colorado, Inc. | Aug 10, 1998 | Aug 12, 1998 | Aug 13, 1998 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-29023 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,441 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman Junction | 2,230 | -789 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,254 | 2,308 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 506 | 12.25 | 275 S |
| 4.5 | 2,430 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 30, 2005 | Jul 7, 2005 | — |
| 00 | Jul 19, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31442 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31442 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 47K
- bbl, all reported
- Feb 2018
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000094772 | W-14 Disposal | Plugged Sep 20, 2017 | 200 | 900 | 2,230–2,310 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731442, documented in the API reference.