WELL · 42-197-31444 · DISTRICT 9

Meharg Unit #1ST

N

Hardeman County · Quinby (Chappel) field  · Directional · Sidetrack

Meharg Unit #1ST (API 42-197-31444) is a well in Hardeman County operated by Assent Energy Partners LLC, completed May 29, 1999.

The RRC has issued 2 drilling permits between 1998 and 1999, permitted to 8,500 ft.

It was permitted by Key Energy Of Colorado, Inc. and has since transferred to Assent Energy Partners LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Palo Pinto, Caddo, Mississippian, Meramec.

Its lease has reported 141K barrels of oil and 3.54K mcf of gas since May 1999, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Assent Energy Partners LLC

Permitted by Key Energy of Colorado, Inc.; the EWA schedule now lists a different operator.

College Sta, TX · P-5 Y, filed Feb 4, 2026 · 3 permits on file · (281) 705-2996

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAssent Energy Partners LLC
Production reportsAssent Energy Partners, LLCthrough Feb 2026
Latest permitKey Energy of Colorado, Inc.Oct 7, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
2
permits on file
Oct 7, 1999
last permit issued
May 29, 1999
completed
141K
cumulative oil, bbl
3.54K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 29, 1999
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Meharg Unit O-13-29648Quinby (Chappel)Assent Energy Partners, LLC2141K3.54KMay 1999 – Jul 2026

Oil, barrels lease total

Last 12 months 516 · prior 12 1,216(-58%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Key Energy of Colorado, Inc.May 1999 → Nov 2013
  2. 2Eagle Energy Acquisitions LPDec 2013 → Aug 2014
  3. 3Eagle Hydrocarbons (Texas) Inc.Sep 2014 → Mar 2015
  4. 4Eagle Hydrocarbons Inc.Apr 2015 → Jun 2020
  5. 5Assent Energy Partners, LLCJul 2020 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
487346-99Recompletion · sidetrackKey Energy of Colorado, Inc.Sep 7, 1999Oct 7, 1999Dec 21, 19998,300
479846-99DrillKey Energy of Colorado, Inc.Oct 1, 1998Dec 17, 1998Apr 8, 19998,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-29648————
—— O-13-29648————

Formation tops

As filed on W-2/G-1. Subsea from 1,457 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LIME5,793-4,336
CaddoCADDO LIME6,488-5,031
MississippianMISSISSIPPIAN LIME7,753-6,296
Meramec8,120-6,663
Meramec8,121-6,664

Perforations

Perforated and open-hole intervals.

FromToType
8,1158,134Perforated
8,1238,131Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62549112.25270 S
5.58,1157.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 6, 2000Feb 14, 2000Yes
00Mar 20, 2000Jun 14, 1999Yes
00Jul 6, 1999Jun 14, 1999Yes
00Jun 21, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19731444, documented in the API reference.