WELL · 42-197-31448 · DISTRICT 9

Young #1

Plugged

Hardeman County · Quinby (Chappel) field  · Vertical

Young #1 (API 42-197-31448) is a plugged well in Hardeman County, plugged June 5, 2025, last operated by Dry Fork Production CO. LLC.

The RRC has issued one drilling permit (amended once), issued June 1, 1999, permitted to 8,500 ft.

It was permitted by Key Energy Of Colorado, Inc. and has since transferred to Dry Fork Production CO. LLC on the wellbore schedule.

Completion filings report 4 formation tops, including Palo Pinto, Caddo, Chester, Meramec Lime.

Its lease has reported 198K barrels of oil and 18.5K mcf of gas since June 1999, last reporting in July 2026.

Operator of record

Dry Fork Production Co. LLC

Permitted by Key Energy of Colorado, Inc.; the EWA schedule now lists a different operator.

Wichita Falls, TX · P-5 Y, filed Feb 4, 2026 · 207 permits on file · (940) 704-7200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDry Fork Production Co. LLC
Production reportsEagle Energy Acquisitions LPthrough Dec 2013
Latest permitKey Energy of Colorado, Inc.Jun 1, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
2
permits on file
Jun 1, 1999
last permit issued
Jun 24, 1999
completed
198K
cumulative oil, bbl
18.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jun 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 24, 1999
Shut in
—
Plugged
Jun 5, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Young O-13-29658Quinby (Chappel)Dry Fork Production Co., LLC1198K18.5KJun 1999 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Key Energy of Colorado, Inc.Jun 1999 → Mar 2012
  2. 2Eagle Energy Acquisitions LPDec 2013 → Dec 2013

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
484908-98DrillKey Energy of Colorado, Inc.Jul 7, 1999Jun 1, 1999Jun 4, 19998,500
484908-99DrillKey Energy of Colorado, Inc.Jun 1, 1999Jun 1, 1999—8,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-29658————

Formation tops

As filed on W-2/G-1. Subsea from 1,446 ft elevation.Download CSV →

FormationMD ftSubsea
Palo PintoPALO PINTO LIME5,528-4,082
CaddoCADDO LIME6,458-5,012
ChesterCHESTER LIME8,002-6,556
Meramec Lime8,088-6,642

Perforations

Perforated and open-hole intervals.

FromToType
8,1118,131Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62550812.25275 S
5.58,1117.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 29, 1999Jul 2, 1999Yes
00Jul 22, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
—
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000125282H-1 InjectionPlugged Jul 9, 20251,0004,0258,111–8,300

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19731448, documented in the API reference.