WELL · 42-197-31622 · DISTRICT 9
Park Unit #1
Hardeman County · Crossroads (Strawn) field · Producing · Vertical
Park Unit #1 (API 42-197-31622) is a well in Hardeman County operated by Ampak Oil Company, completed July 17, 2008 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued January 4, 2008, permitted to 9,000 ft.
Completion filings report 4 formation tops, including Palo Pinto, Bend, Chester, Meramec Lime.
Its lease has reported 69.4K barrels of oil and 15 mcf of gas since July 2008, last reporting in July 2026.
Operator of record
Plano, TX · P-5 Y, filed May 4, 2026 · 223 permits on file · (214) 232-6673
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ampak Oil Company |
| Production reports | Ampak Oil Companythrough Mar 2026 |
| Latest permit | Ampak Oil CompanyJan 4, 2008 |
- 9,000
- total depth, ft
- 2
- permits on file
- Jan 4, 2008
- last permit issued
- Jul 17, 2008
- completed
- 69.4K
- cumulative oil, bbl
- 15
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 17, 2008
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Park Unit O-13-31118 | Crossroads (Strawn) | Ampak Oil Company | 1 | 69.4K | 15 | Jul 2008 – Jul 2026 |
Oil, barrels lease total
Last 12 months 8 · prior 12 27(-70%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Ampak Oil CompanyJul 2008 → Mar 2026
- 2Xplore Operating, LLCOct 2009 → Aug 2013
- 3Trio Consulting & Management,llcSep 2013 → Aug 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 651686-98 | Drill | Ampak Oil Company | Aug 5, 2008 | Jan 4, 2008 | Mar 8, 2008 | 9,000 |
| 651686-99 | Drill | Ampak Oil Company | Dec 18, 2007 | Jan 4, 2008 | Mar 8, 2008 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-31118 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,554 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo PintoPALO PINTO SAND | 5,686 | -4,132 |
| BendBEND CONGLOMERATE | 7,564 | -6,010 |
| ChesterCHESTER LIME | 8,392 | -6,838 |
| Meramec Lime | 8,514 | -6,960 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,688 | 5,698 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 518 | 12.25 | 275 S |
| 5.5 | 8,430 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 11, 2008 | Aug 4, 2008 | Yes |
| 00 | Nov 25, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31622 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31622 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731622, documented in the API reference.