WELL · 42-197-31658 · DISTRICT 9
Turner #1
Hardeman County · Bbbb (Congl.) field · Vertical
Turner #1 (API 42-197-31658) is a plugged well in Hardeman County, plugged December 4, 2024, last operated by Lorac Inc..
The RRC has issued one drilling permit (amended once), issued December 10, 2010, permitted to 7,900 ft.
It was permitted by Enexco, Inc. and has since transferred to Lorac Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Noble Lime, Kma Lime, T Barnett, Chester.
Its lease has reported 46K barrels of oil since July 2011, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Enexco, Inc.; the EWA schedule now lists a different operator.
Dallas, TX · P-5 Y, filed Jan 5, 2026 · 7 permits on file · (214) 533-9641
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Lorac Inc. |
| Production reports | Lorac, Inc.through Sep 2019 |
| Latest permit | Enexco, Inc.Dec 10, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,900
- total depth, ft
- 2
- permits on file
- Dec 10, 2010
- last permit issued
- Jul 11, 2011
- completed
- 46K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 11, 2011
- Shut in
- —
- Plugged
- Dec 4, 2024
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Turner O-13-32000 | Bbbb (Congl.) | Lorac, Inc. | 3 | 46K | 0 | Jul 2011 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Enexco, Inc.Jul 2011 → Mar 2014
- 2MHM Pipeline Co., Inc.May 2014 → May 2014
- 3Lorac, Inc.Jun 2014 → Sep 2019
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 706633-98 | Drill | Enexco, Inc. | Dec 10, 2012 | Dec 10, 2010 | Mar 8, 2011 | 7,900 |
| 706633-99 | Drill | Enexco, Inc. | Dec 8, 2010 | Dec 10, 2010 | Mar 7, 2011 | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-32000 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,365 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Noble Lime | 4,460 | -3,095 |
| Kma Lime | 5,636 | -4,271 |
| T Barnett | 7,550 | -6,185 |
| Chester | 7,690 | -6,325 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,100 | 7,112 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 466 | 12.25 | 340 S |
| 4.5 | 7,328 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 20, 2012 | Jul 21, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-197-31658 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-197-31658 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19731658, documented in the API reference.