WELL · 42-199-30664 · DISTRICT 3
Arco Sec-186 #1
Hardin County · Arco 187 (Yegua 6840) field · Vertical
Arco Sec-186 #1 (API 42-199-30664) is a plugged well in Hardin County, plugged August 17, 2015, last operated by S & S Operating Company Inc..
The RRC has issued 2 drilling permits between 1977 and 1990, permitted to 7,512 ft.
It was permitted by Anderson Producing, Inc and has since transferred to S & S Operating Company Inc. on the wellbore schedule.
Its 3 leases have reported 5.92K barrels of oil and 1.72K mcf of gas since January 1993, last reporting in September 2015. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Anderson Producing, Inc; the EWA schedule now lists a different operator.
Winnie, TX · P-5 Y, filed Mar 4, 2026 · 20 permits on file · (409) 781-3057
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | S & S Operating Company Inc. |
| Production reports | S & S Operating Company, Inc.through Jun 1995 |
| Latest permit | Anderson Producing, IncDec 18, 1990 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,512
- total depth, ft
- 2
- permits on file
- Dec 18, 1990
- last permit issued
- —
- completed
- 5.92K
- cumulative oil, bbl
- 1.72K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Aug 17, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Arco -186- O-3-12419 | Arco 187 (Yegua 6830) | S & S Operating Company, Inc. | 1 | 0 | 0 | Jan 1993 – Sep 2015 |
| Arco 186 O-3-21146 | Arco 187 (Yegua 6800) | S & S Operating Company, Inc. | 1 | 5.92K | 1.72K | Jan 1993 – Sep 2015 |
| — G-3-136687 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1S & S Operating Company, Inc.Jan 1993 → Jun 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 382533-99 | Recompletion | Anderson Producing, Inc | Dec 18, 1990 | Dec 18, 1990 | Dec 20, 1990 | 7,512 |
| 14642-99 | Other | Anderson Producing, Inc | Dec 22, 1977 | Dec 22, 1977 | — | 7,512 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-136687 | — | — | — | — |
| — | — O-3-12419 | — | — | — | — |
| — | — O-3-21146 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,779 | 6,781 | Perforated |
| 6,802 | 6,804 | Perforated |
| 6,830 | 6,832 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 549 | 12.25 | 220 S |
| 2.375 | 3,004 | — | — |
| 2.375 | 6,829 | — | — |
| 4.5 | 6,984 | 7.875 | 845 S |
| 4.5 | 6,984 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 23, 1991 | Aug 22, 1991 | — |
| 00 | Sep 4, 1991 | — | — |
| 00 | Feb 25, 1991 | Jan 10, 1991 | Yes |
| 00 | Feb 1, 1991 | — | — |
| 00 | Jan 12, 1984 | Aug 16, 1979 | — |
| 00 | Jan 12, 1984 | Dec 12, 1978 | — |
| 00 | Jan 12, 1984 | Jan 3, 1978 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-199-30664 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-199-30664 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19930664, documented in the API reference.