WELL · 42-199-32346 · DISTRICT 3

Kirby Lumber Corp. Tr. 126-A #3

Y

Hardin County · Silsbee North (Yegua 2) field · Injection  · Vertical

Kirby Lumber Corp. TR. 126-A #3 (API 42-199-32346) is a well in Hardin County operated by Neches Transport Inc., completed May 8, 2011 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued December 27, 1985, permitted to 3,650 ft.

It was permitted by Breck Operating Corp. and has since transferred to Neches Transport Inc. on the wellbore schedule.

Its lease has reported 10.4K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 301K barrels injected in the 12 months reported through January 2026.

Operator of record

Neches Transport Inc.

Permitted by Breck Operating Corp.; the EWA schedule now lists a different operator.

Spurger, TX · P-5 Y, filed Oct 4, 2025 · 1 permits on file · (409) 429-4403

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNeches Transport Inc.
Production reportsFoundation Oil Company, Inc.through Jul 1995
Latest permitBreck Operating Corp.Dec 27, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,650
total depth, ft
1
permits on file
Dec 27, 1985
last permit issued
May 8, 2011
completed
10.4K
cumulative oil, bbl
21
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 8, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kirby Lumber Corp. Tr. 126-A O-3-9775Silsbee, North (Yegua 2)Neches Transport Inc.210.4K21Jan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Breck Operating Corp.Jan 1993 → Dec 1994
  2. 2Foundation Oil Company, Inc.Jan 1995 → Jul 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
293480-99DrillBreck Operating Corp.Dec 19, 1985Dec 27, 1985—3,650

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-9775————

Perforations

Perforated and open-hole intervals.

FromToType
3,0363,056Perforated
3,2143,224Perforated
3,3903,410Perforated
3,5883,598Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,01612.25830 S
5.53,6547.875195 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 20, 2014Jun 22, 2011—
00Jul 8, 1998Mar 2, 1998—
00Jun 16, 1986Jun 2, 1986—
00Jun 11, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

301K
bbl, last 12 reported months
10.5M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000059441W-14 DisposalActive2,0001,2002,630–3,550

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 301,230 · prior 12 341,370(-12%)

020K40K60K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19932346, documented in the API reference.