WELL · 42-199-32395 · DISTRICT 3
Skinner Beulah #4
Hardin County · Saratoga West field · Vertical
Skinner Beulah #4 (API 42-199-32395) is a plugged well in Hardin County, plugged June 7, 2019, last operated by Clover Oil & Gas Inc..
The RRC has issued one drilling permit, issued October 2, 1986, permitted to 3,400 ft.
It was permitted by Triton Oil & Gas Corp. and has since transferred to Clover Oil & Gas Inc. on the wellbore schedule.
Completion filings report one formation top, including 2700' Sand.
Its lease has reported 4.43K barrels of oil and 22 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Triton Oil & Gas Corp.; the EWA schedule now lists a different operator.
Richardson, TX · P-5 Y, filed Jul 4, 2026 · 27 permits on file · (214) 763-5206
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Clover Oil & Gas Inc. |
| Production reports | Staghorn Resources, LLCthrough Jan 1999 |
| Latest permit | Triton Oil & Gas Corp.Oct 2, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,400
- total depth, ft
- 1
- permits on file
- Oct 2, 1986
- last permit issued
- Nov 23, 1986
- completed
- 4.43K
- cumulative oil, bbl
- 22
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 23, 1986
- Shut in
- —
- Plugged
- Jun 7, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Skinner, Beulah O-3-7027 | Saratoga, West | Clover Oil & Gas, Inc. | 2 | 4.43K | 22 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bristol Resources CorporationJan 1993 → Jul 1998
- 2Staghorn Resources, LLCAug 1998 → Jan 1999
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 321302-99 | Drill | Triton Oil & Gas Corp. | Oct 1, 1986 | Oct 2, 1986 | — | 3,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-7027 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 74 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| 2700' Sand | 2,670 | -2,596 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,904 | 2,914 | Perforated |
| 2,918 | 2,930 | Perforated |
| 2,938 | 2,952 | Perforated |
| 2,962 | 2,966 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 418 | 12.25 | 280 S |
| 5.5 | 3,057 | 7.875 | 550 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 15, 1987 | Dec 17, 1986 | Yes |
| 00 | Jan 13, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-199-32395 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-199-32395 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19932395, documented in the API reference.