WELL · 42-199-32460 · DISTRICT 3
Arco Fee Silsbee #6
Hardin County · Buna West (Wilcox) field · Vertical
Arco Fee Silsbee #6 (API 42-199-32460) is a plugged well in Hardin County, plugged November 1, 1996, last operated by Smith Production Inc..
The RRC has issued one drilling permit, issued February 8, 1988, permitted to 11,300 ft.
It was permitted by Rio Bravo Oil Company and has since transferred to Smith Production Inc. on the wellbore schedule.
Completion filings report one formation top, including Wilcox.
Operator of record
Permitted by Rio Bravo Oil Company; the EWA schedule now lists a different operator.
The Woodlands, TX · P-5 Y, filed Sep 4, 2025 · 433 permits on file · (800) 533-3182
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Smith Production Inc. |
| Production reports | Kriti Exploration, Inc.through Feb 1995 |
| Latest permit | Rio Bravo Oil CompanyFeb 8, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,300
- total depth, ft
- 1
- permits on file
- Feb 8, 1988
- last permit issued
- Apr 30, 1988
- completed
- 0
- cumulative oil, bbl
- 76.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 1999
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 30, 1988
- Shut in
- —
- Plugged
- Nov 1, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Arco Fee Silsbee G-3-127327 | Buna, West (Wilcox) | Smith Production Inc. | 1 | 0 | 76.1K | Jan 1993 – Feb 1999 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rio Bravo Oil CompanyJan 1993 → Sep 1993
- 2Kriti Exploration, Inc.Oct 1993 → Feb 1995
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 342256-99 | Drill | Rio Bravo Oil Company | Feb 4, 1988 | Feb 8, 1988 | — | 11,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-127327 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 40 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 10,840 | -10,800 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,946 | 10,964 | Perforated |
| 11,031 | 11,041 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 67 | — | — |
| 10.75 | 2,635 | 14.75 | 1,560 S |
| 7.625 | 10,739 | 9.875 | 650 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 14, 1988 | Sep 13, 1988 | — |
| 00 | Jun 21, 1988 | May 19, 1988 | Yes |
| 00 | Jun 9, 1988 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-199-32460 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-199-32460 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19932460, documented in the API reference.