WELL · 42-199-32681 · DISTRICT 3

Arco Hcsl #6

N

Hardin County · Wildcat field  · Vertical

Arco Hcsl #6 (API 42-199-32681) is a well in Hardin County operated by Dstj Corporation, completed January 14, 1994.

The RRC has issued one drilling permit (amended once), issued November 10, 1993, permitted to 3,000 ft.

Completion filings report one formation top, including Frio.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 46.3K barrels injected in the 12 months reported through January 2026.

Operator of record

Dstj Corporation

Montgomery, TX · P-5 Y, filed May 11, 2001 · 59 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleDstj Corporation
Production reportsnone
Latest permitDstj CorporationNov 10, 1993
3,000
total depth, ft
2
permits on file
Nov 10, 1993
last permit issued
Jan 14, 1994
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1994 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 14, 1994
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Arco Hcsl O-3-22491Village MillsMilestone Operating, Inc.100May 1994 – Jul 2026
Arco Hcsl O-3-22385WildcatDstj Corporation100Jan 1994 – Jul 1995

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
418092-98DrillDstj CorporationJul 26, 1994Nov 10, 1993—3,000
418092-99DrillDstj CorporationNov 10, 1993Nov 10, 1993Nov 10, 19933,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-22385————
—— O-3-22491————

Formation tops

As filed on W-2/G-1. Subsea from 112 ft elevation.Download CSV →

FormationMD ftSubsea
Frio2,595-2,483

Perforations

Perforated and open-hole intervals.

FromToType
2,8142,820Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62528911200 S
5.52,9897.875625 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 7, 1995Jul 13, 1995—
00Oct 4, 1994Jul 1, 1994—
00Sep 19, 1994——
00Jul 6, 1994Mar 23, 1994Yes
00Jun 1, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

46.3K
bbl, last 12 reported months
3.98M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081738W-14 DisposalActive6,0007502,600–2,850

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 46,279 · prior 12 88,664(-48%)

05K10K15K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19932681, documented in the API reference.