WELL · 42-199-32774 · DISTRICT 3
Blackstone #1ST
Hardin County · Sour Lake E. (Yegua-DF-9) field · Directional · Sidetrack
Blackstone #1ST (API 42-199-32774) is a well in Hardin County operated by Crown Petroleum Corp., completed October 5, 1998.
The RRC has issued 2 drilling permits (amended twice) between 1998 and 2002, permitted to 12,500 ft.
Completion filings report one formation top, including Yegua.
No lease production has been reported under this well’s leases.
Operator of record
Oklahoma City, OK · P-5 Y, filed Jun 4, 2026 · 34 permits on file · (405) 888-6166
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Crown Petroleum Corp. |
| Production reports | S & S Operating Company, Inc.through Apr 2026 |
| Latest permit | Crown Petroleum Corp.Mar 29, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,500
- total depth, ft
- 4
- permits on file
- Mar 29, 2002
- last permit issued
- Oct 5, 1998
- completed
- 0
- cumulative oil, bbl
- 6.96M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 5, 1998
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Black Stone Gas Unit G-3-192034 | Sour Lake, E. (2ND Solow) | S & S Operating Company, Inc. | 1 | 0 | 729K | Jul 2002 – Jul 2026 |
| Blackstone G-3-171444 | Sour Lake, E. (Yegua-DF-9) | Crown Petroleum Corp. | 1 | 0 | 6.23M | Oct 1998 – Jul 2002 |
Gas, mcf lease total
Last 12 months 3,580 · prior 12 2,161(+66%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brammer Engineering, Inc.Oct 1998 → Sep 1999
- 2Hennig Production Co., Inc.Oct 1999 → Feb 2001
- 3Crown Petroleum Corp.Jul 2002 → Feb 2009
- 4Acock Operating LimitedMar 2009 → Nov 2015
- 5Acock/Anaqua Operating Co., LPJun 2009 → Jul 2010
- 6S & S Operating Company, Inc.Dec 2015 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 518683-98 | Recompletion · sidetrack | Crown Petroleum Corp. | Jun 27, 2002 | Mar 29, 2002 | Feb 8, 2002 | 11,900 |
| 518683-99 | Recompletion · sidetrack | Crown Petroleum Corp. | Mar 29, 2002 | Mar 29, 2002 | — | 12,500 |
| 478139-97 | Drill | Brammer Engineering, Inc. | Aug 7, 1998 | Jul 21, 1998 | Aug 11, 1998 | 12,500 |
| 478139-99 | Drill | Brammer Engineering, Inc. | Jul 21, 1998 | Jul 21, 1998 | — | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-171444 | — | — | — | — |
| — | — G-3-192034 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 28 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,702 | 10,726 | Perforated |
| 11,389 | 11,444 | Perforated |
| 11,410 | 11,465 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,176 | 17.5 | 2,310 S |
| 9.625 | 10,000 | 12.25 | 1,020 S |
| 9.625 | 10,000 | 12.5 | 1,020 S |
| 7 | 10,856 | 8.5 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 4, 2003 | Oct 30, 2002 | Yes |
| 00 | Jan 8, 2003 | — | — |
| 00 | Feb 4, 1999 | Dec 8, 1998 | Yes |
| 00 | Jan 28, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-199-32774 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-199-32774 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.