WELL · 42-199-32807 · DISTRICT 3

Black Stone A #1R

Plugged

Hardin County · Sour Lake E. (Yegua-DF-9) field  · Directional

Black Stone A #1R (API 42-199-32807) is a plugged well in Hardin County, plugged December 8, 2009, last operated by Hennig Production CO. Inc..

The RRC has issued 2 drilling permits (amended once) between 1998 and 2000, permitted to 13,500 ft.

Completion filings report 6 formation tops, including Frio, Jackson, Cockfield A, Cockfield B.

Its 2 leases have reported 49.9K barrels of oil and 472K mcf of gas since February 1999, last reporting in March 2010. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Hennig Production Co. Inc.

Tyler, TX · P-5 Y, filed May 4, 2026 · 11 permits on file · (903) 597-5371

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHennig Production Co. Inc.
Production reportsCrown Petroleum Corp.through Jan 2005
Latest permitHennig Production Co., Inc.May 30, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,500
total depth, ft
3
permits on file
May 30, 2000
last permit issued
Feb 13, 1999
completed
49.9K
cumulative oil, bbl
472K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 1999 THROUGH Mar 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 13, 1999
Shut in
—
Plugged
Dec 8, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone "A" O-3-23900Sour Lake, E. (Price)Acock/Anaqua Operating Co., LP149.9K71.6KAug 2000 – Mar 2010
Black Stone 'A' G-3-173435Sour Lake, E. (Yegua-DF-9)Hennig Production Co., Inc.10400KFeb 1999 – Aug 2000

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Brammer Engineering, Inc.Mar 1999 → Sep 1999
  2. 2Hennig Production Co., Inc.Aug 2000 → Mar 2002
  3. 3Crown Petroleum Corp.Apr 2002 → Oct 2004

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
495592-99RecompletionHennig Production Co., Inc.May 30, 2000May 30, 2000May 11, 200011,500
480676-98DrillBrammer Engineering, Inc.Nov 20, 1998Nov 5, 1998Nov 25, 199813,500
480676-99DrillBrammer Engineering, Inc.Nov 5, 1998Nov 5, 1998—13,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-173435————
—— O-3-23900————

Formation tops

As filed on W-2/G-1. Subsea from 57 ft elevation.Download CSV →

FormationMD ftSubsea
FrioLOWER FRIO7,200-7,143
JacksonUPPER JACKSON8,030-7,973
JacksonLOWER JACKSON9,300-9,243
Cockfield A9,750-9,693
Cockfield B9,950-9,893
YeguaYEGUA EY-110,200-10,143
Yega(price)10,988-10,931

Perforations

Perforated and open-hole intervals.

FromToType
10,72210,754Perforated
10,98810,996Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3754,06717.53,110 S
9.6258,47012.25300 S
9.62510,54012.251,100 S
5.511,5258.5550 S
5.511,8588.5600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 27, 2000Sep 12, 2000—
00Nov 22, 2000——
00Jul 20, 1999Mar 23, 1999Yes
00Jul 12, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19932807, documented in the API reference.