WELL · 42-199-32892 · DISTRICT 3

Jamaica #1

Plugged

Hardin County · Wildcat field  · Vertical

Jamaica #1 (API 42-199-32892) is a plugged well in Hardin County, plugged June 7, 2007, last operated by Cobra Oil & Gas Corporation.

The RRC has issued one drilling permit, issued September 23, 2003, permitted to 10,000 ft.

Completion filings report one formation top, including B/Frio.

Operator of record

Cobra Oil & Gas Corporation

Wichita Falls, TX · P-5 Y, filed Dec 4, 2025 · 778 permits on file · (940) 720-2597

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCobra Oil & Gas Corporation
Production reportsnone
Latest permitCobra Oil & Gas CorporationSep 23, 2003
10,000
total depth, ft
1
permits on file
Sep 23, 2003
last permit issued
Oct 28, 2003
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2003 THROUGH Jul 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 28, 2003
Shut in
—
Plugged
Jun 7, 2007

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jamaica O-3-24683WildcatCobra Oil & Gas Corporation100Oct 2003 – Jul 2007

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
536702-99DrillCobra Oil & Gas CorporationSep 23, 2003Sep 23, 2003Oct 12, 200310,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-24683————

Formation tops

As filed on W-2/G-1. Subsea from 64 ft elevation.Download CSV →

FormationMD ftSubsea
B/Frio6,246-6,182

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,01512.251,010 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 21, 2005May 12, 2005Yes
00May 20, 2005——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19932892, documented in the API reference.