WELL · 42-199-32936 · DISTRICT 3
Choate Fee #34
Hardin County · Batson New field · Shut IN · Vertical
Choate Fee #34 (API 42-199-32936) is a well in Hardin County operated by Tandem Energy Corporation, completed February 10, 2005 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued September 13, 2004, permitted to 2,999 ft.
It was permitted by Arrowhead Operating Inc. and has since transferred to Tandem Energy Corporation on the wellbore schedule.
Its lease has reported 960K barrels of oil and 41.8K mcf of gas since January 1993, last reporting in July 2026. The lease carries 57 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Arrowhead Operating Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed May 4, 2026 · 138 permits on file · (281) 351-5840
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tandem Energy Corporation |
| Production reports | Tandem Energy Corporationthrough Apr 2026 |
| Latest permit | Arrowhead Operating Inc.Sep 13, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,999
- total depth, ft
- 1
- permits on file
- Sep 13, 2004
- last permit issued
- Feb 10, 2005
- completed
- 960K
- cumulative oil, bbl
- 41.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 10, 2005
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 57 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Choate Fee O-3-224 | Batson New | Tandem Energy Corporation | 57 | 960K | 41.8K | Jan 1993 – Jul 2026 |
Oil, barrels lease total
Last 12 months 17,017 · prior 12 23,326(-27%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Porter, James W.Jan 1993 → Sep 1993
- 2Porter, James W. SpecialOct 1993 → Jan 2001
- 3Arrowhead Operating Inc.Feb 2001 → Apr 2005
- 4Tandem Energy CorporationMay 2005 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 550611-99 | Drill | Arrowhead Operating Inc. | Sep 7, 2004 | Sep 13, 2004 | Nov 9, 2004 | 2,999 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-224 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,950 | 1,980 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 550 | 11 | 153 S |
| 5.5 | 2,800 | 7.875 | 167 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 9, 2005 | Mar 7, 2005 | Yes |
| 00 | Apr 5, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-199-32936 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-199-32936 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/19932936, documented in the API reference.