WELL · 42-199-33107 · DISTRICT 3

East Texas Oil Company Fee B #9

N

Hardin County · Village Mills (6750) field  · Vertical

East Texas Oil Company Fee B #9 (API 42-199-33107) is a well in Hardin County operated by Milestone Operating Inc., completed February 15, 2008.

The RRC has issued 3 drilling permits between 2007 and 2011, permitted to 7,500 ft.

Completion filings report 3 formation tops, including Frio, Yegua, Cook Mountain.

Its 3 leases have reported 460K barrels of oil and 674K mcf of gas since January 1993, last reporting in July 2026. The leases carry 8 wells, so these are lease totals, not this well alone.

Operator of record

Milestone Operating Inc.

Montgomery, TX · P-5 Y, filed Dec 4, 2025 · 90 permits on file · (936) 447-1174

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMilestone Operating Inc.
Production reportsMilestone Operating, Inc.through Mar 2026
Latest permitMilestone Operating, Inc.Oct 3, 2011
7,500
total depth, ft
3
permits on file
Oct 3, 2011
last permit issued
Feb 15, 2008
completed
460K
cumulative oil, bbl
674K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 15, 2008
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
East Texas Oil Company Fee "B" O-3-21875Village Mills (Cockfield 2)Milestone Operating, Inc.5430K598KJan 1993 – Jul 2026
East Texas Oil Company Fee "B" O-3-25499Village Mills (Cockfield 1-A)Milestone Operating, Inc.219.5K66.1KJan 2010 – Jul 2026
East Texas Oil Company Fee "B" O-3-25141Village Mills (6750)Milestone Operating, Inc.111.2K9.46KFeb 2008 – Jan 2012

Gas, mcf lease total

Last 12 months 996 · prior 12 1,184(-16%)

0100200300202420252026

Oil, barrels lease total

Last 12 months 78 · prior 12 158(-51%)

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Dstj CorporationJan 1993 → Mar 2001
  2. 2Glickenhaus Energy CorporationMay 1994 → Oct 2000
  3. 3Milestone Operating, Inc.Apr 2001 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
725072-99RecompletionMilestone Operating, Inc.Sep 27, 2011Oct 3, 2011Aug 29, 20117,500
709485-99RecompletionMilestone Operating, Inc.Jan 31, 2011Feb 4, 2011—7,500
650981-99DrillMilestone Operating, Inc.Dec 7, 2007Dec 14, 2007Dec 22, 20077,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-21875————
—— O-3-25141————
—— O-3-25499————

Formation tops

As filed on W-2/G-1. Subsea from 120 ft elevation.Download CSV →

FormationMD ftSubsea
Frio2,640-2,520
Yegua5,700-5,580
Cook Mountain7,205-7,085

Perforations

Perforated and open-hole intervals.

FromToType
5,7175,719Perforated
5,7385,748Perforated
5,8765,879Perforated
5,8815,884Perforated
6,6456,649Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,87512.25730 S
5.57,3028.75625 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 13, 2012Oct 5, 2011—
00Jan 26, 2012Feb 9, 2011—
00May 13, 2008Mar 3, 2008Yes
00May 1, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19933107, documented in the API reference.