WELL · 42-199-33187 · DISTRICT 3

Black Stone Hamilton #1

Y

Hardin County · Sour Lake Easter (Yegua) field · Temp Abandoned  · Directional

Black Stone Hamilton #1 (API 42-199-33187) is a well in Hardin County operated by Wagner Oil Company, completed February 3, 2009 and listed as temp abandoned on the RRC schedule.

The RRC has issued one drilling permit, issued October 8, 2008, permitted to 13,000 ft.

It was permitted by Cimarex Energy CO. and has since transferred to Wagner Oil Company on the wellbore schedule.

Completion filings report 3 formation tops, including Frio, Moodys Branch, Ey 1.

No lease production has been reported under this well’s leases.

Operator of record

Wagner Oil Company

Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Sep 4, 2025 · 278 permits on file · (800) 457-5332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsCimarex Energy Co.through Jan 2015
Latest permitCimarex Energy Co.Oct 8, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Oct 8, 2008
last permit issued
Feb 3, 2009
completed
0
cumulative oil, bbl
707K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2009 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 3, 2009
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone Hamilton G-3-249838Sour Lake Easter (Yegua)Wagner Oil Company10707KFeb 2009 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cimarex Energy Co.Feb 2009 → Jan 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
672153-99DrillCimarex Energy Co.Sep 30, 2008Oct 8, 2008Nov 22, 200813,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-249838————

Formation tops

As filed on W-2/G-1. Subsea from 26 ft elevation.Download CSV →

FormationMD ftSubsea
FrioBASE FRIO7,100-7,074
Moodys Branch9,425-9,399
EY 19,825-9,799

Perforations

Perforated and open-hole intervals.

FromToType
10,05910,079Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,36017.52,655 S
9.6259,92012.251,460 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 5, 2009Jun 22, 2009Yes
00Aug 3, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/19933187, documented in the API reference.